预估日期确定性: 预估目标日期,而非确定日期来源对日期的表述有多确定:已确认、已排期、预估、已推迟或未核实。显示所有“预估”的图钉可信度 95%总体可信度: 95%该图钉的来源和参考资料对其日期的支持程度。包括来源在内的 2 份资料对图钉开始和结束时间支持程度的加权平均;资料每比最新的一份旧 180 天,权重减半显示所有可信度不低于 75% 的图钉164天后
Estimated commercial operation target of April 2027 based on CAISO generator interconnection queue schedule and state regulatory filings.[1]Intersect Power is constructing the 140M USD, 100 MW / 400 MWh four-hour lithium-ion battery energy storage system in northern Livermore Valley, Alameda County, California, interconnecting to PG&E's Cayetano substation.
$140M