CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins95% CONFIDENCEOverall confidence: 95%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference, the source included, supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
The pin marks the June 3, 2026 study publication. The 2028 basecase and network-upgrade dates do not establish a project COD.[1]
PJM’s June 2026 study identifies Dominion’s AG2-077 as a 200 MW solar addition in Charlotte County sharing AF2-042’s interconnection. Combined capability is 700 MW; the incremental request is 200 MW.
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins95% CONFIDENCEOverall confidence: 95%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
The confirmed milestone is the June 3, 2026 study release; no new-battery COD is established.[1]
PJM’s June 2026 study identifies Aurora Generation, LLC’s AH1-563 as a 150 MW / 600 MWh, four-hour addition at Aurora E.C. The 1,206 MW figure is combined gas/storage capability, not standalone battery capacity.
Estimated: Approximate location in Brunswick County, Virginia; exact AG2-571 storage parcel pendingZeus storage, LLC
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins95% CONFIDENCEOverall confidence: 95%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference, the source included, supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
The pin marks the June 3, 2026 study release. Neither its 2028 basecase nor a transmission-upgrade date is an established COD.[1]
PJM identifies Zeus storage, LLC’s AG2-571 in Brunswick County as a 100 MW / 400 MWh addition to the 400 MW solar request AG2-570. The 500 MW figure is combined facility capability.
Estimated: Retained approximate county/project-area marker; exact project parcel unverifiedCassius Blue Solar LLC
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins95% CONFIDENCEOverall confidence: 95%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference, the source included, supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Confirmed Phase II study publication, not construction or commissioning.[1]
PJM’s June 3, 2026 Phase II study identifies Cassius Blue Solar LLC in Sussex County, Virginia: 85 MW / 340 MWh storage addition; 479 MW is total facility scope, not this battery rating.
Estimated: Approximate location in Madison County, Ohio; exact Oak Run storage parcel pendingOak Run Solar Project, LLC
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins95% CONFIDENCEOverall confidence: 95%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
The pin marks publication of the June 3, 2026 studies. Their 2028 basecase is not a commissioning date; the former December 2029 COD is removed.[1]
PJM’s June 2026 studies identify Oak Run Solar Project, LLC’s two storage requests, AG2-106 and AG2-107, at Marysville–Flatlick in Madison County, Ohio. Each specifies 150 MW of capacity rights and 600 MWh; 800 MW is the combined facility capability.
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins95% CONFIDENCEOverall confidence: 95%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference, the source included, supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
The confirmed event is June 3, 2026 study publication; a 2028 basecase is not project COD.[1]
PJM’s June 2026 study identifies Lightsource Renewable Energy Development LLC’s AH1-482 as a 78 MW / 312 MWh, four-hour storage addition to AG1-349 solar in Pulaski County, Indiana. The 338 MW figure is combined facility capability.
Estimated: Lee County, Illinois; retained approximate county/POI-area context, not a surveyed storage parcelSteward Creek Solar, LLC
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins95% CONFIDENCEOverall confidence: 95%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference, the source included, supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Confirmed Phase II report release, not commercial operation or agreement execution.[1]
PJM’s June 3, 2026 Phase II study identifies Steward Creek Solar LLC’s AG2-660 in Lee County: zero added energy MW, 20 MW added capacity credit and a proposed 200 MWh / four-hour storage specification. The shared solar facility has 600 MW MFO.
Estimated: McHenry County, Illinois; retained approximate county/project-area point, exact battery footprint unverifiedMonarch Grid, LLC
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins95% CONFIDENCEOverall confidence: 95%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference, the source included, supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Confirmed Phase II report release, not actual commissioning.[1]
PJM’s June 3, 2026 Phase II study names Monarch Grid LLC’s AG2-545 at Silver Lake 345 kV in McHenry County: a 400 MW storage uprate, 160 MW capacity credit and proposed 1,600 MWh / four-hour class. Physical interconnection study is available.
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins84% CONFIDENCEOverall confidence: 84%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
VRT[1] NWS, published Wednesday 3 June 2026, says spokesman Jason Sevestre confirms the plan and that it was the first time Aldi had informed the unions of its concrete plans.
Aldi presented unions with a plan to open all its Belgian stores on Sundays from 8:30 to 13:00, staffed by volunteers paid a premium or given extra leave; unions said the hours break the Sunday closing law.
Kia, 111, Peters Canyon, Walnut, Irvine, Orange County, California, 92606, United StatesKia
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins85% CONFIDENCEOverall confidence: 85%How well the pin's source and references back up its dates.Weighted average of how firmly 7 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Carscoops[1] (3 June 2026): 'Kia has announced the 2027 Seltos will start at $24,990 ... before a $1,495 destination fee'; TFLcar[6][7] (5 June 2026) repeats the new MSRPs.
Kia announced US pricing for the second-generation 2027 Seltos on 3 June 2026: $24,990 before destination for the 147-hp LX, rising to $32,790 for the 190-hp turbocharged X-Line SX, with gasoline models reaching dealers that summer and the hybrid later.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins95% CONFIDENCEOverall confidence: 95%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Date of developer-reported review delay in WIVB, not commercial operation.[1]
WIVB’s June 3 report identifies Riverview Innovation and Technology Campus at the former Tonawanda Coke site, with 300 MW proposed demand and 500000 sqft. The developer delayed site-plan review while intending to continue; the prior Super DC/Huntley-site attribution is unsupported.
1450 Page Mill Road, Stanford Research Park, Palo Alto, California, USA (xAI, a SpaceX subsidiary; also Bastrop, Texas)xAI
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins79% CONFIDENCEOverall confidence: 79%How well the pin's source and references back up its dates.Weighted average of how firmly 5 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
xAI's news page is dated 'Jun 3, 2026' and says the model 'is now available via the xAI API in preview'; Gigazine[3] quotes the @grok post of 3 June. Arena listed the model as #1 from 30-31 May (alias grok-imagine-video-1.5-2026-05-30), which is a leaderboard debut, not a public release.
xAI puts grok-imagine-video-1.5-preview in its API: an image-to-video model with native audio at up to 720p that debuted at or near the top of the Image-to-Video arenas, two days after a first appearance on Arena.
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins90% CONFIDENCEOverall confidence: 90%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference, the source included, supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Confirmed dated milestone: Construction announcement dated June 4, 2026; the reviewed announcement does not give a data-centre opening day.[1]
Under construction. Google and Intersect announced construction of a data centre co-located with new energy generation across Gray and Roberts Counties. The proposal uses air cooling to limit water consumption. No MW figure for the data centre is asserted here.
Las Vegas Strip Circuit, Paradise, Nevada 89109, United StatesFormula One Group
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins88% CONFIDENCEOverall confidence: 88%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
F1.com, stamped "Jun 04, 2026 10:01pm UTC": "Formula 1[1][2] will continue racing in Las Vegas ... through to 2037, following a new 10-year extension"; the end is the exclusive boundary after 2037.
A new 10-year deal between Las Vegas Grand Prix, Inc., Clark County and the LVCVA keeps the Saturday-night Strip race on the Formula 1 calendar through 2037.
Supreme Court of the United States, 1 1st Street Northeast, Washington, DC 20543, United StatesVerizon
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins83% CONFIDENCEOverall confidence: 83%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
The slip opinion reads "No. 25-406. Argued April 21, 2026 - Decided June 4, 2026", decided together with No. 25-567, Verizon Communications, Inc. v. Federal Communications Commission.[1]
The Supreme Court ruled 8-1 that the FCC can issue forfeiture orders without a jury, upholding the ruling against Verizon over its $46.9 million fine for selling access to customers' location data and reversing AT&T's win over its $57 million fine.
1818, Cornwall Avenue, Kitsilano, Vancouver, Metro Vancouver Regional District, British Columbia, V6J 4M6, CanadaLululemon
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins90% CONFIDENCEOverall confidence: 90%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
The release is dated "June 4, 2026" and its Business Wire copy on Yahoo[3] Finance was published at 2026-06-04T20:05:00Z (4:05 pm EDT).
Lululemon cut its 2026 EPS outlook by more than $1 to $10.95-$11.15 and forecast falling sales, blaming negative media commentary and weak product launches; the shares fell 11% after hours.
Ramon Cojuangco Building, Makati Avenue, San Lorenzo, District I, Makati, Southern Manila District, Metro Manila, 1226, PhilippinesPLDT
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins84% CONFIDENCEOverall confidence: 84%How well the pin's source and references back up its dates.Weighted average of how firmly 5 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Stated as done, per PLDT's PSE/SEC[1] disclosure (6-K exhibit): "on June 4, 2026, the Company executed a Share Purchase Agreement with Paragon Vertical Corporation... and Radius Telecoms, Inc."; no signing time is given.
PLDT signed a share purchase agreement with Meralco's Paragon Vertical for the 65.1% of fibre carrier Radius Telecoms it does not own, a PHP 2.935 billion deal that will make Radius a wholly owned unit once the competition and telecom regulators approve.
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins90% CONFIDENCEOverall confidence: 90%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Confirmed announced milestone: Operator announced the grand opening June 4, 2026. The date records the stated ceremony or dated announcement; it does not imply current apartment availability.[1]
Avenue C offers 120 one- and two-bedroom affordable apartments for adults 55+ in Magnolia Park / the East End. [2] Operator announced the grand opening June 4, 2026.
Parc del Fòrum, 1-3, Passeig del Taulat, Diagonal Mar i el Front Marítim del Poblenou, Sant Martí, Barcelona, Barcelonès, Barcelona, Catalonia, 08019, SpainPrimavera Sound
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins78% CONFIDENCEOverall confidence: 78%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Wikipedia[1][2]: 'Primavera Sound[3] 2026 was a music festival that took place from 4–6 June 2026 at the Parc del Fòrum in Barcelona, Spain. It was the 24th edition of the festival.'
Primavera Sound's 24th Barcelona edition sold out for a second straight year and drew 287,000 people to Parc del Fòrum, but heavy rain and 80 km/h winds cancelled Thursday's sets by Doja Cat, Massive Attack and Bad Gyal.
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins91% CONFIDENCEOverall confidence: 91%How well the pin's source and references back up its dates.Weighted average of how firmly 5 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Confirmed announced milestone: Developer published its grand-opening announcement June 4, 2026. The date records the stated ceremony or dated announcement; it does not imply current apartment availability.[1]
Atlantic Square is a 616-apartment mixed-income tower in Overtown with affordable, workforce and market-rate housing, near Brightline, Metrorail and Metromover. Developer published its grand-opening announcement June 4, 2026. Published rents: Workforce plans, operator FAQ starting price From $1,980.
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins87% CONFIDENCEOverall confidence: 87%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better68%
Firm, already-passed release date confirmed by Amazon MGM Studios' own release: "in theaters in the U.S. on June 5, 2026."[1]
Mattel's He-Man franchise gets a live-action feature, with Nicholas Galitzine as Prince Adam and Jared Leto as Skeletor, directed by Travis Knight.
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins88% CONFIDENCEOverall confidence: 88%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better23%
Firm, already-passed wide release date per Rotten Tomatoes[1]' release-date panel: "Jun 5, 2026, Wide."
Marlon Wayans and Shawn Wayans revive the horror-spoof franchise 26 years later, as Shorty, Ray, Cindy, and Brenda are targeted by another masked slasher.