The first entry is always the pin's source. Overall confidence is a weighted average of how firmly each reference supports the start and end times used above; a reference counts half as much for every 180 days older than the newest.
Confirmed Phase II study publication, not construction or commissioning.
Something missing or wrong? Say it in your own words: a link that backs this pin up, a different start or end date and why, or a fact it lacks or gets wrong. The AI checks it against this pin's sources, searches for better ones, and adds any page that backs you up. The pin's own sources still count most. A picture that shows something else, or shows it badly, is looked at too, and moved down or replaced.
Power storage85 MW · Published project/request capacity, not measured output. PJM’s June 3, 2026 Phase II study identifies Cassius Blue Solar LLC in Sussex County, Virginia: 85 MW / 340 MWh storage addition; 479 MW is total facility scope, not this battery r · source