- Start
- Jul 21, 197790% CONFIDENCEfrom the source
The First 412,000 Barrels Go Underground at West Hackberry
- The first delivery was about 412,000 barrels of Saudi Arabian light crude, on 21 July 1977[1]
- Construction began that April, when the government bought existing Gulf Coast salt caverns to hold the first 250 million barrels[2]
- West Hackberry sits in Cameron Parish, Louisiana, about 25 miles south-west of Lake Charles; it now has 21 caverns and an authorised capacity of 220.4 million barrels[2]
- A cavern is made by drilling into a salt dome and dissolving the salt with fresh water: about seven barrels of raw water for every barrel of storage[2]
References 390% CONFIDENCE
The first entry is always the pin's source. Overall confidence is a weighted average of how firmly each reference supports the start and end times used above; a reference counts half as much for every 180 days older than the newest.
- [1]90%energy.gov/hgeo/articles/spr-celebrates-40th-anniversary-first-oil-deliveryenergy.gov· Posted Sep 22, 2026· Starts Jul 21, 1977 ✓· 33% of score
DOE's own 40th-anniversary piece gives the day: "On July 21, 1977, the SPR received its first oil delivery."
- [2]95%SPR Storage Sites (US Department of Energy)energy.gov· Added Sep 22, 2026· 33% of score
DOE's page on the four sites, for West Hackberry's location, cavern count and capacity and for how the caverns were made.[1]
- [3]85%History of the Strategic Petroleum Reserve (US Department of Energy)energy.gov· Added Sep 22, 2026· 33% of score
Explains why salt caverns on the Gulf Coast were chosen and what the reserve can hold.[1]
Suggest a correction
Something missing or wrong? Say it in your own words: a link that backs this pin up, a different start or end date and why, or a fact it lacks or gets wrong. The AI checks it against this pin's sources, searches for better ones, and adds any page that backs you up. The pin's own sources still count most.