- Start
- Dec 31, 203275% CONFIDENCEfrom the source
CPK Poland's Central Transport Hub Targets 2032 Opening
- Poland's new central airport at Centralny Port Komunikacyjny (CPK), branded Port Polska, is set to open in 2032 with capacity for 34 million passengers a year, confirmed at a parliamentary infrastructure committee session (May 2026)[2]
- CPK board member Dariusz Kus said options for a larger airport at opening are being built in[2]
- CPK is a flagship project combining a new international airport with a nationwide high-speed rail and road network[2][3]
- CPK planned to launch tenders worth more than $10 billion in 2026 as it targets a 2032 opening[3]
References 376% CONFIDENCE
The first entry is always the pin's source. Overall confidence is a weighted average of how firmly each reference supports the start and end times used above; a reference counts half as much for every 180 days older than the newest.
- [1]75%youtube.com/watch?v=wbV6f5G90AYyoutube.com· Posted Sep 14, 2026· Starts Dec 31, 2032 ✓· 53% of score
Given as scheduled, per the source: "Port Polska's new airport is set to open in 2032".
- [2]75%Port Polska Airport to Open in 2032 with 34m Capacityrustourismnews.com· Published May 28, 2026· 35% of score
RUS Tourism News confirms the airport is 'scheduled to open in 2032 with an initial capacity of 34 million passengers,' matching the pin's stored date.
- [3]80%Poland's CPK Sets Out $10B Tender Pipeline For 2026aviationweek.com· Published Sep 9, 2025· 13% of score
Aviation Week reports CPK 'targets a 2032 opening' with over $10 billion in tenders planned, matching the pin's stored December 2032 date, though the full article sits behind a paywall.
Suggest a correction
Something missing or wrong? Say it in your own words: a link that backs this pin up, a different start or end date and why, or a fact it lacks or gets wrong. The AI checks it against this pin's sources, searches for better ones, and adds any page that backs you up. The pin's own sources still count most.