The GCAP Combat Air Demonstrator Begins Flight Testing
GESCHÄTZT62 % SICHERHEITA span the event runs from, per aerospacetestinginternational.com[1]: "Power-on is planned for mid-2027, aircraft ready by the end-2027 with flight test starting from early 2028", so the pin takes the first day of that period.
Flight tests of the UK’s crewed sixth-generation demonstrator are due to start from early 2028, after power-on in mid-2027. More than 11,500 parts – about 90% of the aircraft’s weight – have been designed and released, with final assembly under way in Lancashire.
1.00