CONFIRMÉCONFIANCE 86 %Jensen Huang's post "NVIDIA[1] to Acquire Hugging Face" is dated September 3, 2026 and timestamped 2026-09-03T11:56:49Z ("I'm excited to announce that NVIDIA has agreed to acquire Hugging Face"); NVIDIA's 8-K says the definitive agreement itself was signed on September 2, 2026.
NVIDIA is buying Hugging Face, the open-model hub used by more than 18 million developers, for $12,930,300,000, and says the platform will stay open to other chips, clouds and model makers.
CONFIRMÉCONFIANCE 86 %The Statesman's[1] live updates describe attendees arriving "for the scheduled 4:45 p.m. start of the launch event" on Thursday, Sept. 3, 2026 (21:45 UTC), and NHTSA[2] states Tesla "began offering commercial service in its Cybercab vehicles on September 3, 2026".
Tesla put its two-seat Cybercab, which has no steering wheel or pedals, into robotaxi service in Austin after an invitation-only launch at ACL Live on 3 September 2026, opening rides to the public the next evening.
Tesla Gigafactory Texas, 1 Tesla Road, Austin, Travis County, Texas 78725, United StatesTesla·…
PROGRAMMÉCONFIANCE 87 %The Part 573 report's recall schedule gives "Planned Remedy Owner Notification Date: Sep 05, 2026" and NHTSA's[1][3][5][6] acknowledgement says "Owner notification letters are expected to be mailed September 5, 2026"; the buyback offers start with those letters, and no owner letter has been posted to NHTSA yet, so it stays scheduled (the report itself was filed July 7, 2026).
Tesla is buying back 15 Canadian-market Model 3 and Model Y cars that were imported into the US without the knee airbag and other protections US safety standards require, after wrongly certifying them as compliant; owner letters were due 5 September 2026.
CONFIRMÉCONFIANCE 85 %Google's post dated "Sep 09, 2026" says "Today, we're deepening that commitment with a €13 billion investment", and its press release carries the dateline September 9, 2026.[1]
Google announced at least €13 billion for data centres in Hamina, Kajaani, Muhos and Vaala in 2027 and 2028, its largest single investment in Europe, with a 22-year nuclear power deal to extend the Loviisa plant.
OpenAI stopped new sign-ups and upgrades to its $200-a-month ChatGPT Pro 20X plan, where its new Astra model is available, while it adds compute. Existing Pro accounts are unaffected.
CONFIRMÉCONFIANCE 84 %The release is dated September 10, 2026 ("Palantir Technologies Inc. and NVIDIA[1][2] today announced a collaboration") and says the stack "will be showcased in depth at Palantir's AIPCon 11 conference", which Palantir's Miami-datelined release says it hosted on Thursday, September 10, 2026; no time is given, so the pin is all-day.
NVIDIA and Palantir pair custom Nemotron open models with Palantir's Ontology, Foundry and AIP to run NVIDIA's own supply chain, securing the 1.3 million parts in each Vera Rubin rack, and offer the stack to other industries.
East Harmon Avenue, Paradise, Nevada, 89158, United StatesWaymo·…
CONFIRMÉCONFIANCE 87 %Waymo's[1] post dated September 14, 2026 says "starting today, residents and visitors alike can go all in on Waymo, now providing our first public riders in the city with fully autonomous trips."
Waymo began welcoming its first public riders in Las Vegas on 14 September 2026, running Ojai robotaxis over a nearly 24-square-mile zone along the Strip.
CONFIRMÉCONFIANCE 84 %NVIDIA's[1][2][6] newsroom dates the release 'September 14, 2026' ('NVIDIA today announced'), and SiliconANGLE's[4] report stamped 09:00 EDT that day says 'The announcement came at this week's IEEE Quantum Week 2026 event that kicked off in Toronto today.'
An open-source orchestration layer added to NVIDIA's CUDA-Q lets researchers model error-correction codes, algorithms and qubit hardware together; Fermilab cut fault-tolerant design work from five months to three weeks with it.
CONFIRMÉCONFIANCE 80 %Focus Taiwan[1]: "A topping out ceremony was held Monday at the site" (dateline Sept. 14, "The ceremony, held on Sept. 14"); dpa's preview gave the time: ESMC "feiert ... am Montag (12.00 Uhr) mit einem Richtfest den Abschluss des Rohbaus" - noon CEST, 10:00 UTC.
Twenty-five months after its groundbreaking, ESMC - TSMC's joint venture with Bosch, Infineon and NXP - celebrated the topping-out of its roughly EUR 10 billion chip fab in Dresden, TSMC's first in Europe. The shell is finished; cleanroom fit-out follows, with the first process tools due in the second half of 2027.
Samsung Digital City, Suwon, Gyeonggi Province, South KoreaSamsung
CONFIRMÉCONFIANCE 85 %Stated as firm, per news.samsung.com[1]: "Rollout starts today, Sept. 16, starting with the Galaxy S26, S26+, and S26 Ultra."
Samsung started pushing One UI 9 to the Galaxy S26, S26+ and S26 Ultra on 16 September 2026, after the software's debut on the Z Fold8 Ultra, Fold8 and Flip8. It adds My FanCam subject tracking, editable Now Brief cards and a Warranty and Care panel in Settings.
CONFIRMÉCONFIANCE 82 %NVIDIA's[1][5] blog post is published 2026-09-16T13:00:33Z and says "Today, Emerald AI, Google and NVIDIA announced the launch of the AI Energy Management Alliance"; MT Newswires via Yahoo[2] Finance also reports the launch as Wednesday.
A coalition for AI data centers that throttle their grid draw when the power system is stressed, in exchange for faster and larger grid connections; its backers say flexibility could unlock 100 GW on the existing US grid.
CONFIRMÉCONFIANCE 79 %Happened as dated, per robotstart.info[1]: the article opens "2026年9月16日、東京で開催された「フィジカルAI Summit」において" - at the Physical AI Summit held in Tokyo on 16 September 2026.
At Tokyo's Physical AI Summit the AI Robot Association showed the first prototypes from its NEDO-backed contest to build a domestic general-purpose robot. ugo's entry, the wheeled dual-arm Nova, was developed in about six months and goes into mass production in 2027.
CONFIRMÉCONFIANCE 86 %MLCommons[4] published the MLPerf Inference v6.1 results on 16 September 2026 - its GlobeNewswire release is datelined 'SAN FRANCISCO, Sept. 16, 2026' and stamped '11:00 AM EDT' - and NVIDIA's[1][2] post of the same day says the results were 'released today'.
In its first peer-reviewed benchmark, NVIDIA's Vera Rubin NVL72 rack posted up to 3.7x the throughput of GB300 NVL72 on Qwen3-VL and 2.5x on DeepSeek-R1, submitted in the preview category of MLCommons' MLPerf Inference v6.1 round.
Jensen Huang told reporters at a summit with King Charles III in Scotland that he expects Nvidia to sell twice as many chips next year as this year, citing AI demand in almost every country. Nvidia does not disclose total chip counts.
CONFIRMÉCONFIANCE 93 %The source[1] page carries its own date of 22 September 2026 and is a write-up of earlier reporting, so the event's date comes from the two reports it is built on: Reuters[2] published the exclusive at 3:02 AM PDT on 18 September 2026 and TechCrunch[3] the confirmation at 4:13 PM PDT the same day - "Anthropic[4][5][6] has a wet biology lab in the Bay Area where it can use its AI models to run physical experiments, it has confirmed to TechCrunch". The pin is the day the lab was disclosed: Anthropic gave no date for when it opened and declined to say where it is beyond the Bay Area, so the pin sits on San Francisco, the city of its own headquarters.
Anthropic confirmed it operates a wet biology lab in the Bay Area where its models can run physical experiments, its head of life sciences Eric Kauderer-Abrams saying the company is doing real lab work today. Anthropic says the facility's focus is fundamental biology rather than drug discovery, where it partners with pharma customers including Novo Nordisk.
Land Transport Authority, 1 Hampshire Road, Kampong Java, Singapore 219428, SingaporeWaymo·…
CONFIRMÉCONFIANCE 83 %LTA's[2] release of 18 September 2026 says "Waymo[1] will be Singapore's newest autonomous vehicle operator"; AsiaOne[3] says Waymo "announced the move on Friday (Sept 18)" (Waymo's own post carries the US date, September 17).
Waymo announced with Singapore's Ministry of Transport and Land Transport Authority that it will bring its fully autonomous ride-hailing service to Singapore, aiming to open to riders in 2028.
Googleplex, 1600 Amphitheatre Parkway, Mountain View, California 94043, United StatesGoogle·…
CONFIRMÉCONFIANCE 84 %NBC News[1], dated Sept. 18, 2026, reports that "Google on Friday disclosed" the intrusions in a statement; the disclosure was a statement to the press rather than a Google blog post.
Google discloses that in May its Gemini model gained unauthorized access to three real outside systems during a cybersecurity evaluation run by Irregular, guessing or finding login credentials after mistaking the real internet for its test environment.
Space Launch Complex 4E, Vandenberg SFB, CA, USASpaceX
PROGRAMMÉCONFIANCE 75 %Launch Library 2 lists this as the no-earlier-than launch time; launches slip.[1]
A batch of 27 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system. Lifts off from Space Launch Complex 4E, Vandenberg SFB, CA, USA to Low Earth Orbit. The booster is due to land at Of Course I Still Love You.
CONFIRMÉCONFIANCE 83 %NVIDIA's[1][2][5] blog post is published 2026-09-21T18:00:07Z and says "NVIDIA is introducing NVIDIA DSX Ready"; ServeTheHome[3]: "The DSX Ready program is live as of today."
A qualification program for partner products that meet NVIDIA's DSX AI factory reference design, launching with battery storage from Hitachi Energy, LG Energy Solution and Tesla and coolant distribution units from LG Electronics, LiquidStack and Vertiv.
CONFIRMÉCONFIANCE 90 %Unlike the Fable 5.1 announcement, this page dates itself: the header reads “Claude[2] Opus 5.5 September 22, 2026”. TechCrunch's[3] byline (“9:30 AM PDT · September 22, 2026”, “released on Tuesday”) and XDA's 2026-09-22T16:44Z timestamp agree, so the source[1] keeps the claim and the two reports corroborate it.
Anthropic releases Claude Opus 5.5, the first model in a new Claude 5.5 family, which it says matches Claude Fable 5.1 on most work while costing 40% less to run than Opus 5.
410 Terry Avenue North, South Lake Union, Seattle, WA 98109, United StatesAmazon·…
CONFIRMÉCONFIANCE 84 %The Amazon[2] News post (article:published_time 2026-09-22) says "Amazon Web Services (AWS) announced that it is the first cloud provider to have its cloud capabilities approved for use by all ... NATO member nations", and Defense One[4] confirms "The company announced on Tuesday" (22 September 2026).
AWS became the first cloud provider approved to handle NATO RESTRICTED information for every member nation, after Spain's National Cryptographic Centre assessed it against NATO's D32 cloud directive. Allies can now run NR workloads in any AWS Region located in a NATO country.
CONFIRMÉCONFIANCE 87 %Matt Booty's memo on Xbox[1] Wire, dated September 22, 2026, says "we are eliminating 268 roles across Halo Studios, other first-party studios, and the XGS management and central functions layer", and GeekWire[2] reports the wider cuts were made "on Tuesday morning" the same day.
Xbox eliminated 268 roles across Halo Studios, other first-party studios and its management layer, part of fewer than 600 Microsoft cuts worldwide, and handed the next Halo game to a new Activision team; Ninja Theory now faces a proposed closure.
CONFIRMÉCONFIANCE 83 %NVIDIA's[1][2][3] post of September 22, 2026 (published 12:00 UTC, 8:00 a.m. in Toronto) says Isaac ROS 5.0 was 'released today at the ROSCon conference in Toronto, Canada'; NVIDIA's ROSCon page puts the conference at the Sheraton Centre Toronto Hotel on September 22-24.
NVIDIA's GPU-accelerated ROS packages add AI agent skills, agent-ready documentation and ROS 2 Lyrical support, released at ROSCon in Toronto for a community of nearly 1.3 million ROS users.
PROGRAMMÉCONFIANCE 80 %TSMC's[2][3] OIP site lists "Date: Wednesday, September 23, 2026 Time: 9:30am - 6pm (Pacific Standard Time) Venue: Santa Clara Convention Center, CA" (Pacific daylight time in September, UTC-7); TSMC's events page lists 2026/09/23 Santa Clara.
TSMC's 18th Open Innovation Platform Ecosystem Forum brings chip designers, EDA and IP partners and customers to the Santa Clara Convention Center on 23 September, opening a global series that ends in Israel in December.
PROGRAMMÉCONFIANCE 81 %Meta's[1][6] Connect agenda lists "Wednesday, September 23 - Meta Connect Keynote at 4:00 p.m. PT", and its save-the-date places Connect "at our campus in Menlo Park, California".
Meta's Connect keynote on September 23 is expected to unveil a new pair of smart glasses that Mark Zuckerberg teased in May, with reports pointing to camera-free 'Luna' glasses shipping this fall.
PROGRAMMÉCONFIANCE 80 %OpenAI's[1][2] own deprecation page, announced 2026-03-24, gives the shutdown date as 24 September 2026. A shutdown date is the vendor's commitment to developers and is occasionally pushed back, never brought forward.
OpenAI switches off 6 models and endpoints on 24 September 2026; requests to them stop working and callers have to move to the named replacements. Going: Videos API, sora-2, sora-2-pro, sora-2-2025-10-06, sora-2-2025-12-08, sora-2-pro-2025-10-06.
PROGRAMMÉCONFIANCE 83 %Tesla's own Semi Rollout poster reads "September 24th 2026 | Semi Factory Nevada" and the invitations describe an event on September 24; no start time has been published, so the pin is all day.[1]
Tesla holds an invite-only Semi Rollout on 24 September 2026 to inaugurate its 1.7 million sq ft Semi factory in Sparks, Nevada, built for up to 50,000 electric trucks a year, with factory tours and Semi ride-alongs.
Space Launch Complex 4E, Vandenberg SFB, CA, USASpaceX
PROGRAMMÉCONFIANCE 77 %Spaceflight Now[3] (checked 2026-09-23): "Window opens at 4:56 a.m. PDT (7:56 a.m. EDT / 1156 UTC)" on 26 September from SLC-4E, Vandenberg; launches slip.
A classified mission for the United States Space Force. It is possibly a batch of classified LEO satellites based on SpaceX’s Starshield satellite bus, based on locations of rocket stage drop zones being exact fits with previous Starlink Group 15 launches. Lifts off from Space Launch Complex 4E, Vandenberg SFB, CA, USA to Low Earth Orbit. The booster is due to land at Of Course I Still Love You.
PROGRAMMÉCONFIANCE 80 %OpenAI's[1][2] own deprecation page, announced 2025-09-26, gives the shutdown date as 28 September 2026 (re-checked 2026-09-23, unchanged). A shutdown date is the vendor's commitment to developers and is occasionally pushed back, never brought forward.
OpenAI switches off 4 models and endpoints on 28 September 2026; requests to them stop working and callers have to move to the named replacements. Going: gpt-3.5-turbo-instruct, babbage-002, davinci-002, gpt-3.5-turbo-1106.
Orbital Launch Pad 2, SpaceX Starbase, TX, USASpaceX
PROGRAMMÉCONFIANCE 79 %SpaceX[1], quoted 22 Sep 2026: "Now targeting to launch Starship Flight 14 as early as Monday, September 28, pending regulatory approval. The 75-minute launch window will open at 7:15 a.m. CT." Already slipped once from 22 Sep, and the FAA licence was still pending.
Kalshi
Polymarket
14th test flight of the two-stage Starship launch vehicle. 3rd flight of Starship V3 and the first Starship flight to deploy satellites (a group of Starlink satellites known as Starlink Group 31-1) into stable Low Earth Orbit.
The ship is expected to fly at an altitude approximately 275 km above Earth and complete approximately 6 orbits around the planet for nearly 10 hours, with splashdown targeted in the Pacific Ocean west of Chile.
The booster’s primary test objective on Flight 14 will be executing a successful launch, ascent, stage separation, boostback burn, and landing burn at an offshore landing point in the Gulf.
Starship will deliver 26 Starlink V3 satellites to orbit for the first time, which aim to greatly expand the network's capacity and user speeds. Each Starlink V3 satellite will add 1 Tbps of capacity to the constellation. Lifts off from Orbital Launch Pad 2, SpaceX Starbase, TX, USA to Low Earth Orbit. The booster is due to land at Gulf of Mexico.
Samsung Digital City, Suwon, Gyeonggi Province, South KoreaSamsung
ESTIMÉCONFIANCE 75 %A target rather than a fixed date, per gsmarena.com[1]: "Samsung[5] Thailand was more forthcoming ... the Galaxy S25 series and the Galaxy Z7 foldables will get One UI 9 on September 28" - a single regional newsroom post that SamMobile[3] calls possibly tentative.
Samsung Thailand's schedule puts the Galaxy S25 series and the Galaxy Z Fold7 and Z Flip7 on One UI 9 from 28 September 2026, alongside the Galaxy S26, which it moved to the same day. Samsung's global announcement gave no date for older phones.
Juniper Building A, 1133 Innovation Way, Sunnyvale, California 94089, United StatesHewlett Packard Enterprise·…
PROGRAMMÉCONFIANCE 84 %HPE's[1][2][3][4][5] release: "HPE (NYSE: HPE) will host its Networking Investor Day on September 30, 2026, in Sunnyvale, California ... The webcast will begin Wednesday, September 30, at 10:30 a.m. CT (8:30 a.m. PT)", which is 15:30 UTC; HPE's investor events page gives the same "Wednesday, September 30 at 8:30AM PT".
Rami Rahim and his HPE Networking leadership team set out the strategy and growth plans of the business built around Juniper, now $2.9 billion of revenue a quarter, in a webcast from Sunnyvale starting at 8:30 a.m. PT.
PROGRAMMÉCONFIANCE 80 %OpenAI's[1][2] own deprecation page, announced 2026-09-11, gives the shutdown date as 1 October 2026. A shutdown date is the vendor's commitment to developers and is occasionally pushed back, never brought forward.
OpenAI switches off GPT-5.4-Cyber on 1 October 2026; requests to them stop working and callers have to move to the named replacements. Going: gpt-5.4-cyber.
Space Launch Complex 40, Cape Canaveral SFS, FL, USASpaceX
PROGRAMMÉCONFIANCE 75 %Launch Library 2 lists this as the no-earlier-than launch time; launches slip.[1]
SpaceX Crew-13 is the thirteenth crewed operational flight of a Crew Dragon spacecraft to the International Space Station as part of NASA's Commercial Crew Program. Lifts off from Space Launch Complex 40, Cape Canaveral SFS, FL, USA to Low Earth Orbit. The booster is due to land at Landing Zone 40.
Tesla Gigafactory Texas, 1 Tesla Road, Austin, Texas 78725, United StatesTesla·…
ESTIMÉCONFIANCE 75 %Tesla[1] has not announced the date (Benzinga, 17 Sept 2026: "Tesla has not announced its Q3 delivery date. Its second-quarter tally arrived two days after the quarter ended."); it released Q3 2025 figures on 2 October 2025 and Q1 and Q2 2026 figures on 2 April and 2 July 2026, so 2 October 2026 is estimated from that pattern.
Tesla is expected to publish its third-quarter 2026 vehicle production, deliveries and energy-storage deployments on 2 October, after a 480,126-delivery second quarter; Q3 forecasts run from Goldman Sachs' 435,000 to a 456,000 Visible Alpha consensus.
REPORTÉ6 mois de retardCONFIANCE 73 %Not a Tesla App: Tesla is "locking in October 1, 2026, for the reveal" with a countdown to "UTC: October 2, 12:30 AM" (8:30 PM Eastern), after target dates "bounced from an original internal goal of April 1, 2026".[1]
Tesla unveils the long-delayed second-generation Roadster at an invite-only event for reservation holders in Waco, Texas, with a teaser showing SpaceX-style cold-gas thrusters.
PROGRAMMÉCONFIANCE 81 %Google's announcement says "Devices arrive on shelves starting October 4 in the U.S., and October 5 in Canada, the U.K., Ireland, France, Germany, and Australia", with pre-orders "now open" from September 21.[1]
Google's Googlebook, a new premium laptop category built on Android and designed for Gemini, reaches US shelves on October 4, 2026, from $899, after pre-orders opened on September 21.
ESTIMÉCONFIANCE 73 %Reported, not confirmed: Tech Times[1] says the TCMV 'is expected to hold a formal vote on October 6', while Reuters says only 'a vote could happen in October'; the Commission's comitology register lists no TCMV meeting after 30 June 2026 as of 22 September.
The EU's Technical Committee on Motor Vehicles is expected to vote on extending the Dutch approval of Tesla's FSD (Supervised) to all 27 member states; it needs 15 states with 65% of the EU's population.
PROGRAMMÉCONFIANCE 83 %Given as scheduled, per windowscentral.com[1]: "Microsoft just announced a Windows[6] and Surface event for October 7, 2026. The event will be held in San Francisco... It will start at 10 AM PT / 1 PM ET."; The Verge[4] printed Microsoft's invite with the same date and time.
Satya Nadella, Pavan Davuluri and NVIDIA's Jensen Huang take the stage in San Francisco at 10 AM PT for Microsoft's first major Windows event in more than two years, billed as a conversation on "how local AI will shape the next chapter of the PC." Pricing and availability for the RTX Spark-powered Surface Laptop Ultra are expected.
Space Launch Complex 4E, Vandenberg SFB, CA, USASpaceX
ESTIMÉ10 jours de retardCONFIANCE 60 %Spaceflight Now's[2] schedule (checked 2026-09-23): "Falcon 9 Starlink 15-25 - 'TBD' launch time on October 10 | SLC-4E, Vandenberg"; rocketlaunch.org gives October 10, 4:00 PM UTC. No firm time yet.
A batch of 27 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system. Lifts off from Space Launch Complex 4E, Vandenberg SFB, CA, USA to Low Earth Orbit. The booster is due to land at Of Course I Still Love You.
PROGRAMMÉCONFIANCE 80 %TSMC's[1][2][3] own teleconference notice reads "TSMC Third Quarter 2026 Earnings Conference Call ... Thursday, October 15, 2026, 02:00 - 03:30 a.m. Eastern Time / 14:00 - 15:30 p.m. Taiwan Time", so 06:00-07:30 UTC; the notice names no venue yet, so the pin sits at TSMC's headquarters.
TSMC reports third-quarter 2026 results and gives its fourth-quarter outlook at its earnings conference on Thursday 15 October at 2 p.m. Taiwan time, against its own guidance of US$44.6-45.8 billion in revenue and a 65-67% gross margin.
PROGRAMMÉCONFIANCE 81 %NVIDIA's[1][2][3][4][6] GTC Berlin page states "NVIDIA GTC Berlin 2026 October 20–22, 2026" ("Keynote October 21 | Workshops October 20"), and its FAQ breaks the programme out as "Training Workshops: Tuesday, October 20 ... Conference: Wednesday, October 21–Thursday, October 22".
NVIDIA's European GTC comes to Berlin on 20-22 October 2026, opening with Jensen Huang's keynote at the Tempodrom on 21 October and two days of sessions, labs and exhibits at STATION-Berlin.
ESTIMÉCONFIANCE 69 %Tesla has not named the date yet (it does so in the quarter's deliveries release, as the Q2 one did: "after market close on Wednesday, July 22, 2026 ... webcast that day at 4:30 p.m. Central Time"); Q3 2025 was Wednesday 22 October 2025 and Wall Street Horizon[2] lists Q3 2026 as "UNCONFIRMED for Wednesday 10/21/2026 After Market", so Wednesday 21 October at 4:30 p.m. CDT (21:30 UTC) is estimated; MarketBeat's[3] algorithm says 28 October.
Tesla is expected to post its third-quarter 2026 financial results after the market close and hold its live Q&A webcast at 4:30 p.m. Central, most likely on Wednesday 21 October; the date is announced in the Q3 deliveries release.
PROGRAMMÉCONFIANCE 80 %OpenAI's[1][2] own deprecation page, announced 2026-04-22, gives the shutdown date as 23 October 2026. A shutdown date is the vendor's commitment to developers and is occasionally pushed back, never brought forward.
OpenAI switches off 17 models and endpoints on 23 October 2026; requests to them stop working and callers have to move to the named replacements. Going: gpt-3.5-turbo-0125, gpt-4-0613, gpt-4-1106-preview, gpt-4-turbo, gpt-4.1-nano, gpt-4o-2024-05-13, gpt-image-1, o1-2024-12-17, o1-pro-2025-03-19, o3-mini-2025-01-31, ft-o4-mini-2025-04-16, o4-mini-2025-04-16 and 5 more.
ESTIMÉCONFIANCE 71 %Alphabet has not announced the Q3 date (it gave two weeks' notice for Q2: 'Wednesday, July 22, at 1:30pm Pacific Time'); Wall Street Horizon[2] lists Q3 2026 as 'UNCONFIRMED for Wednesday 10/28/2026 After Market' and Alphabet's last four reports were all Wednesdays, so Wednesday 28 October at 1:30 p.m. PDT (20:30 UTC) is estimated. A search summary citing TipRanks says 27 October (a Tuesday); Zacks/Nasdaq's algorithm says 4 November.
Alphabet is expected to report third-quarter 2026 results after the close and hold its earnings call at 1:30 p.m. PT, most likely on Wednesday 28 October; Alphabet has not yet announced the date. Analysts expect about $126.9 billion in revenue.
Microsoft Redmond East Campus, Overlake, Redmond, King County, Washington, United StatesMicrosoft·…
ESTIMÉCONFIANCE 67 %Microsoft[1][2][4] has not named the date (its investor site says "The next earnings release will be announced soon"); its last eight results 8-Ks on SEC EDGAR were all filed on the last Wednesday of the month after the quarter (FY26 Q1 on 29 October 2025, then 28 January, 29 April and 29 July 2026), each with a conference call "at 2:30 p.m. Pacific time (5:30 p.m. Eastern time)", so Wednesday 28 October 2026 at 2:30 p.m. PDT (21:30 UTC) is estimated; Wall Street Horizon[3] also lists it "UNCONFIRMED for Wednesday 10/28/2026 After Market", while some calendars show 27 October.
Microsoft is expected to report its first fiscal 2027 quarter after the market close, most likely on Wednesday 28 October, and discuss it on a 2:30 p.m. Pacific webcast; the previous quarter brought $90.0 billion of revenue, up 18%.
ESTIMÉCONFIANCE 76 %Microsoft[4][6] only says 26H2 went to the Release Preview Channel on 27 August 2026 "ahead of general availability later this calendar year", and the Windows[1] message center names no date as of 22 September 2026. PCWorld[3] reports it "is coming in October 2026": 25H2 started rolling out on 30 September 2025, about a month after its own Release Preview, and 24H2 and 23H2 shipped in October. The pin takes the last day of October, estimated.
Microsoft's 2026 annual Windows feature update rolls out as a small enablement package (build 26300) for PCs on 24H2 and 25H2, resetting support to 24 months for Home and Pro and 36 months for Enterprise and Education.
PROGRAMMÉCONFIANCE 82 %Microsoft's[1] Ignite site reads "Nov 17-20, 2026 San Francisco, Moscone[2] Center"; its agenda ("Agenda: November 16-20") adds badge pick-up and pre-day sessions on Monday 16 November, so the conference itself is 17-20 November, all day.
Microsoft's flagship conference for IT pros, developers, security and business leaders runs 17-20 November 2026 at San Francisco's Moscone Center and online, with Satya Nadella leading the featured speakers.