La prima voce è sempre la fonte del pin. L’affidabilità complessiva è una media ponderata di quanto ogni fonte conferma gli orari di inizio e fine indicati sopra; una fonte conta la metà per ogni 180 giorni in più rispetto alla più recente.
Documented physical milestone or dated progress/reporting marker. Period-end dates represent only the reported month/quarter; they do not invent an exact operation date. Source estimates are labelled and not treated as confirmed future opening dates.
Published project-specific cost for Baltic Power[4]: EUR 4.05e+09. Basis: Published project capex including insurance, excluding the separately described financing/reserve components. Published electric generating project rating for Baltic Power: 1140 MW. Basis: 76 operator-reported turbines × 15 MW; corroborated by inventory rating.
Northland Q2 2026 update confirms Baltic Power[2][4] first power, 61 of 76 turbines installed, 15 generating and construction/commissioning ongoing. Full commercial operations remain a second-half 2026 target; costs are aligned with original expectations.
Operator forecasts 4,000 GWh yearly electricity production; this is expected annual energy, distinct from rated MW.[1]
Manca qualcosa o c’è un errore? Dillo con parole tue: un link che conferma questo pin, una data di inizio o fine diversa e perché, o un fatto che manca o è sbagliato. L’IA lo confronta con le fonti del pin, ne cerca di migliori e aggiunge qualsiasi pagina ti dia ragione. Le fonti del pin contano comunque di più. Anche un’immagine che mostra altro, o lo mostra male, viene esaminata e spostata in basso o sostituita.
Baltic Power publishes approximately €4.05 billion capital expenditure including insurance within an approximately €4.73 billion total budget. The larger budget also includes financing costs and reserve; the €4.4 billion credit package is not used as construction cost. The generating project has 76 turbines rated 15 MW each, totaling 1,140 MW; it is reported under construction in the August inventory.[2][3][4]
Published project-specific cost for Baltic Power: EUR 4.05e+09. Basis: Published project capex including insurance, excluding the separately described financing/reserve components. Published electric generating project rating for Baltic Power: 1140 MW. Basis: 76 operator-reported turbines × 15 MW; corroborated by inventory rating.[2]
Northland Q2 2026 update confirms Baltic Power first power, 61 of 76 turbines installed, 15 generating and construction/commissioning ongoing. Full commercial operations remain a second-half 2026 target; costs are aligned with original expectations.[3]
Operator forecasts 4,000 GWh yearly electricity production; this is expected annual energy, distinct from rated MW.[4]
Retained only with documented physical construction, commissioning or 2025–2026 opening and published project-specific costs and electrical output. Costs use the published scope and currency; no benchmark estimates or currency conversions. MW is power capacity, not annual electricity production. Expected annual energy, where given, is a forecast. The map point is a reported plant/project location and may be approximate. Matching inventory views and excluded expansion proposals are not additive capacity.