発表済み
Energy: battery storage · 確認日 2026-10-30
確認された段階のみ強調しています。数値と日付は計画と実証済みを区別しています。
200 MW battery storage request; preliminary interconnection scope, not measured output.
“"poiName":"7ASTER - 7CMDR 345.0kV","summerNetMW":200.0”
2027-05-28; requested date only, not an achieved opening.
“"projectNumber":"S1095","queueDate":"2025-04-22T04:00:00+00:00","inService":"2027-05-28T04:00:00+00:00"”
Active; queue status does not establish physical construction or commercial service.
“"applicationStatus":"Active","sisPhase1":"","postGIAStatus":""”
Battery Storage; 7ASTER - 7CMDR 345.0kV.
“"fuelType":"Battery Storage","facilityType":"Battery Storage"”
Interconnection request received
“"projectNumber":"S1095","queueDate":"2025-04-22T04:00:00+00:00"”
Requested in-service date
“"projectNumber":"S1095","queueDate":"2025-04-22T04:00:00+00:00","inService":"2027-05-28T04:00:00+00:00"”
このピンはニュースを追い、最新の情報を表示しています。何が変わり、何がきっかけだったかをここに示します。
編集@ThePinGang による
MISO regional transmission interconnection development of the 7Aster to 7Cmdr Energy Storage Facility in Perry County, Illinois. ProvidingS1095 is a 200 MW / 800 MWh of grid-scale battery storage along the 345 kV transmission corridor, the system replaces retired southern Illinois coal capacity with flexible zero-carbon storage dispatch.battery storage interconnection request in Perry, IL. The grid operator lists its queue status as Active. The requested in-service date is 2027-05-28; this is a planning date.
Vistra Corp advanced regulatory filings for the 7Aster to 7Cmdr Energy Storage FacilityS1095 is a 200 MW battery storage interconnection request in Perry County, Illinois. Encompasses 200 MW / 800 MWh of advanced lithium-ion energy storage capacity. Represents an estimated 210 million USD clean infrastructure investment in southern Illinois. Interfaces with MISO's 345 kV high-voltage transmission network along State Route 13. Replaces retiring fossil generation with responsive, zero-carbon battery storage dispatch. Timeline: planned project targeting commercial operation in May 2027 (estimated) under MISO interconnection queue and state regulatory schedules.Perry, IL. The grid operator lists its queue status as Active. The requested in-service date is 2027-05-28; this is a planning date. The point of interconnection is 7ASTER - 7CMDR 345.0kV. Queue processing status does not establish physical construction or commercial operation. No exact-scope construction budget is published in the cited grid record. Battery power is distinct from stored energy; no four-hour duration or battery MWh is inferred.
編集@ThePinGang による
… fossil generation with responsive, zero-carbon battery storage dispatch. Timeline: planned project targeting commercial operation in May 2027 (estimated) under MISO interconnection queue and state regulatory schedules.
読者の写真で、出典付きのピンのメディアとは別に表示されます。食べたものや見たものを評価でき、レストランのピンでは写真上に料理をタグ付けできます。
最初の項目は常にピンの出典です。全体の確度は、各資料が上記の開始・終了時刻をどれだけ強く裏付けているかの加重平均です。最新の資料より180日古くなるごとに、重みは半分になります。
足りない点や誤りがありますか? このピンを裏付けるリンク、別の開始日・終了日とその理由、欠けている情報や誤っている情報を、自由に書いてください。AIがこのピンの出典と照らし合わせ、より良い情報源を探し、裏付けとなるページがあれば参考資料として追加します。ピン自身の出典が引き続き最も重視されます。AIは画像も確認します。別のものが写っている画像や写りの悪い画像は、後ろに回すか差し替えます。
元のタイトル: 7Aster to 7Cmdr: 200 MW Battery Interconnection Request S1095
Power storage200 MW · S1095: 200 MW requested battery storage. Queue status: Active. Requested date: 2027-05-28. Not current measured generation; No annual energy or battery MWh inferred. · source