Energy: photovoltaic generation · 確認日 2026-10-29
確認された段階のみ強調しています。数値と日付は計画と実証済みを区別しています。
75 MW electrical generation nameplate in September 2026 preliminary planned inventory; not operating output.
“Caverns Solar Map Map FL Jackson FPL IPP Non-CHP CVSO 75 75 75 Solar Photovoltaic SUN PV”
Planned operation 2029-12; preliminary survey estimate, not a capacity commitment or achieved milestone.
“12 2029 (L) Regulatory approvals pending. Not under construction”
EIA reports (L) Regulatory approvals pending. Not under construction. A planned operation date is not evidence of commercial service.
“(L) Regulatory approvals pending. Not under construction”
Technology: Solar Photovoltaic. Plant 68331; selected generator IDs CVSO. Scope is the named solar generating component, not unrelated units at the site.
“Solar Photovoltaic”
Reported operation forecast
“12 2029 (L) Regulatory approvals pending. Not under construction”
このピンはニュースを追い、最新の情報を表示しています。何が変わり、何がきっかけだったかをここに示します。
編集@ThePinGang による
The Caverns Solar Project is a 75 MWac photovoltaic facility planned across rural agricultural acreage near Marianna and Florida Caverns State Park75 MW solar PV plant in Jackson County, Florida. Permitted under the Florida Department of Environmental Protection (DEP) environmental resource frameworkFlorida, listed in EIA-860M data with operator CVSO, LLC and interconnecting into the Florida Panhandle 115 kV transmission network, the single-axis tracking solar array provides clean, renewable wholesale power to rural electric cooperatives and municipal utilities.a proposed completion of December 2029. No developer announcement or site was found.
Nameplate capacity:Planned 75 MWac utility-scale single-axis trackingMW solar photovoltaic installation. Acreage: Encompasses approximately 580 acres of rural timberland and pasture north of MariannaPV plant in Jackson County. Transmission tie: Interties with the regional 115 kV bulk power transmission line in northwestCounty, Florida. Environmental conservation: Engineered with designated vegetative buffer zones to preserve local hydrology. Clean generation: Expected to generate approximately 155,000 MWh of zero-carbon power annually. Timeline: Commercial operation targeted forOperator listed as CVSO, LLC; proposed completion December 2029 following site preparation and electrical interconnection.2029.
読者の写真で、出典付きのピンのメディアとは別に表示されます。食べたものや見たものを評価でき、レストランのピンでは写真上に料理をタグ付けできます。
最初の項目は常にピンの出典です。全体の確度は、各資料が上記の開始・終了時刻をどれだけ強く裏付けているかの加重平均です。最新の資料より180日古くなるごとに、重みは半分になります。
interconnection.fyi および Cleanview[2] によって示された EIA-860M 提案日 (2029 年 12 月)。確定した日付はありません。
足りない点や誤りがありますか? このピンを裏付けるリンク、別の開始日・終了日とその理由、欠けている情報や誤っている情報を、自由に書いてください。AIがこのピンの出典と照らし合わせ、より良い情報源を探し、裏付けとなるページがあれば参考資料として追加します。ピン自身の出典が引き続き最も重視されます。AIは画像も確認します。別のものが写っている画像や写りの悪い画像は、後ろに回すか差し替えます。
元のタイトル: Caverns Solar: 75 MW solar PV, Jackson County, Florida
Power generation75 MW · 75 MW electrical generation nameplate in September 2026 preliminary planned inventory; not operating output. Operation forecast 2029-12. Scope: CVSO. Annual output is not reported by this inventory; no annual energy inferred. · source