Construction research 2026-10-24: Epoch’s[1] 2026-04-23 observation documents the identified building scope complete or operating, using physical observations or explicit delivery rather than an elapsed target date. Completed is limited to that scope. Power and accelerator counts remain Epoch estimates, not an operator-certified rating. Modeled 2025-dollar capital costs include compute hardware and are not a source-native construction budget. Google’s actual Waltham Cross opening corroborates complete buildout, distinct from the generic 250MW seed value. Source quote: “Full buildout reconfirmed via high-resolution Pléiades-Neo satellite image” Dated observation 2026-04-23; future trajectory rows and modeled costs are distinguished from this physical milestone.
足りない点や誤りがありますか? このピンを裏付けるリンク、別の開始日・終了日とその理由、欠けている情報や誤っている情報を、自由に書いてください。AIがこのピンの出典と照らし合わせ、より良い情報源を探し、裏付けとなるページがあれば参考資料として追加します。ピン自身の出典が引き続き最も重視されます。AIは画像も確認します。別のものが写っている画像や写りの悪い画像は、後ろに回すか差し替えます。
Physical-stage observation dated 2026-04-23. Named completed buildings only; later expansion is not marked completed. Forecast operational dates retain the directory’s uncertainty and do not establish actual completion.
“Full buildout reconfirmed via high-resolution Pléiades-Neo satellite image”
Epoch’s dated 2026-04-23 assessment: Full buildout reconfirmed via high-resolution Pléiades-Neo satellite image Named completed buildings only; later expansion is not marked completed.
“Full buildout reconfirmed via high-resolution Pléiades-Neo satellite image”
Epoch estimates AI hardware: Google TPU v6e chips. Chip fit-out is directory research, not operator-certified inventory.
“We estimate that it uses Google TPU v6e chips.”
Epoch dated observation: Land clearing begins (Sentinel-2 imagery).
“Land clearing begins (Sentinel-2 imagery).”
Epoch dated observation: Full buildout reconfirmed via high-resolution Pléiades-Neo satellite…
“Full buildout reconfirmed via high-resolution Pléiades-Neo satellite image; no capacity change since September 2025.”
元のタイトル: Google Waltham Cross AI Data Center — Completed Buildings
エポック社の 2026 年 4 月 23 日の観測では、目標の経過日ではなく、物理的な観測または明示的な納品を使用して、特定された建築範囲の完了または稼働状況が記録されています。 完了はその範囲に限定されます。 パワーとアクセル数はエポック社の推定値のままであり、オペレーターが認定した評価値ではありません。 モデル化された 2025 ドルの資本コストにはコンピューティング ハードウェアが含まれており、ソースネイティブの建設予算ではありません。 Google の実際の Waltham Cross 開設は、一般的な 250MW シード値とは異なり、完全な構築を裏付けています。
注釈付きの衛星フットプリント (5 つの物理的部分) を使用して Epoch AI によって追跡されるハイパースケール フロンティア AI トレーニングおよび推論キャンパス。