Opened primary project source for sourced buildout metrics and project timeline; researched 2026-10-29.[1]
Electrek reports Tesla's[2] own announcement of the Gigafactory's grand opening event on 29 July 2016, roughly 18 months earlier than the pin's stored 1 January 2018.
Utility Dive independently corroborates the 29 July 2016 grand opening date for the Gigafactory Nevada.
Something missing or wrong? Say it in your own words: a link that backs this pin up, a different start or end date and why, or a fact it lacks or gets wrong. The AI checks it against this pin's sources, searches for better ones, and adds any page that backs you up. The pin's own sources still count most. A picture that shows something else, or shows it badly, is looked at too, and moved down or replaced.
More than 11,000 direct team members reported; 17,000 buildout construction jobs are separate.
“11,000 team members”
5.4 million square feet built in the existing Gigafactory.
“5.4 million square foot”
Operator reports 37-plus GWh annual battery-cell production and 7.3 billion cells cumulatively by January 2023.
“37 GWh+ annually”
Existing factory output documented
“January 24, 2023”