rewritten 43 added, 27 removed
Peregrine Energy Solutions is developing the 180M USD, SPP’s October 22, 2026 active listing identifies GEN-2022-130 as a 200 MW / 800 MWh grid-scale lithium-ion battery storage center in Fort Smith, Sebastian County, Arkansas, interconnecting on SPP 161 kV.Sebastian County battery at Battlefield BESS 161 kV, with an executed IA and December 31, 2030 commercial-operation target. The filing does not verify the former $180M cost, 800 MWh duration or Peregrine attribution.
rewritten 70 added, 104 removed
Peregrine Energy Solutions advanced engineering and zoning approvals for the 200 MW / 800 MWh Sebastian Energy StorageThe facility in western Arkansas. Features 200 MW of four-hour duration lithium-ion battery cells housed in climate-controlled enclosure banks with fire mitigation systems. Represents an estimated 180 million USD clean energy infrastructure investment under Southwest Power Pool (SPP) Interconnection Queue GEN-2023-088. Interconnects tostudy describes OG&E Battlefield Substation upgrades. Its approximately $10.36M utility works estimate excludes the customer substation and line and is not project capex. SPP separates proposed in-service September 15, 2027 from commercial-operation December 31, 2030. Use the OG&E / SPP 161 kV transmission grid near the Fort Smith regional manufacturing hub. Provides ancillary frequency regulation, voltage support, and energy arbitrage acrossCOD column for this estimated event. The tracker’s Sebastian/Peregrine lead is plausibly this matching county/capacity request, but primary documents do not name the Arkansas River Valley. Timeline: planned project targeting commercial operation in October 2028 (estimated) under SPP interconnection queue and state regulatory schedules.developer. That identity linkage remains unconfirmed; map is retained as approximate.