Something missing or wrong? Say it in your own words: a link that backs this pin up, a different start or end date and why, or a fact it lacks or gets wrong. The AI checks it against this pin's sources, searches for better ones, and adds any page that backs you up. The pin's own sources still count most. A picture that shows something else, or shows it badly, is looked at too, and moved down or replaced.
Power generation500 MW · Proposed/studied scope, not measured output or evidence of operation. ERCOT identifies Aquila Solar as Ben Milam Solar 5’s 500 MW solar request at Gibson Switch 345 kV in Milam County. Its requested commercial date is November 12, 2026; the · source