The first entry is always the pin's source. Overall confidence is a weighted average of how firmly each reference supports the start and end times used above; a reference counts half as much for every 180 days older than the newest.
Confirmed final retool study release date, not commercial operation.
Something missing or wrong? Say it in your own words: a link that backs this pin up, a different start or end date and why, or a fact it lacks or gets wrong. The AI checks it against this pin's sources, searches for better ones, and adds any page that backs you up. The pin's own sources still count most. A picture that shows something else, or shows it badly, is looked at too, and moved down or replaced.
Power generation250 MW · Published project/request capacity, not measured output. PJM’s May 14, 2026 final retool study identifies Goldfinch Solar LLC’s AF2-111 request in Mason County, Kentucky, at 250 MW energy and 150 MW capacity. Geronimo Power describes Gol · source