Something missing or wrong? Say it in your own words: a link that backs this pin up, a different start or end date and why, or a fact it lacks or gets wrong. The AI checks it against this pin's sources, searches for better ones, and adds any page that backs you up. The pin's own sources still count most. A picture that shows something else, or shows it badly, is looked at too, and moved down or replaced.
2026-10-30: withdrawal recorded in the opened queue. The actual withdrawal day is not published.
“"applicationStatus":"Withdrawn"”
Withdrawn request; this does not establish site-wide project cancellation.
“"applicationStatus":"Withdrawn"”
Solar; point of interconnection Smalling.
“"fuelType":"Solar"”
Withdrawal recorded in MISO queue (date checked; withdrawal day unpublished)
“"applicationStatus":"Withdrawn"”
The MISO queue was checked on October 30, 2026 and records this request as withdrawn. The actual withdrawal date is not published; the timeline milestone records the date checked.[1]
Power generation600 MW · J2519: 600 MW requested photovoltaic generation. Queue status: Withdrawn. Requested date: 2026-10-31. Not current measured generation; withdrawn request. No annual energy or battery MWh inferred. · source