EIA-860M proposed date shown by interconnection.fyi and Cleanview[2] (December 2029); no firm date.
Something missing or wrong? Say it in your own words: a link that backs this pin up, a different start or end date and why, or a fact it lacks or gets wrong. The AI checks it against this pin's sources, searches for better ones, and adds any page that backs you up. The pin's own sources still count most. A picture that shows something else, or shows it badly, is looked at too, and moved down or replaced.
“(L) Regulatory approvals pending. Not under construction”
Technology: Solar Photovoltaic. Plant 68331; selected generator IDs CVSO. Scope is the named solar generating component, not unrelated units at the site.
“Solar Photovoltaic”
Power generation75 MW · 75 MW electrical generation nameplate in September 2026 preliminary planned inventory; not operating output. Operation forecast 2029-12. Scope: CVSO. Annual output is not reported by this inventory; no annual energy inferred. · source