Only the month is supported. 1985-08-01 is a timeline anchor, not a confirmed operating day. Both units are voluntarily shut in August 1985 to address safety, management and organizational issues. Day 1 is a month-level anchor.
Reactor timeline, electrical capacity and annual electricity supplied; historical table derived from IAEA PRIS.[1]
Something missing or wrong? Say it in your own words: a link that backs this pin up, a different start or end date and why, or a fact it lacks or gets wrong. The AI checks it against this pin's sources, searches for better ones, and adds any page that backs you up. The pin's own sources still count most. A picture that shows something else, or shows it badly, is looked at too, and moved down or replaced.
Both units are voluntarily shut in August 1985 to address safety, management and organizational issues. Day 1 is a month-level anchor.[1]
2296 MW electrical capacity. Combined historic reference electrical capacity: 1,148 MWe net per unit; both units shut for recovery.[2]
Cost: not assigned. No event-specific published construction/restart budget was verified. Financing, damages and other phases are not substituted.
Only the month is supported. 1985-08-01 is a timeline anchor, not a confirmed operating day. Both units are voluntarily shut in August 1985 to address safety, management and organizational issues. Day 1 is a month-level anchor.
Photo: Tennessee Valley Authority. Sequoyah station, from TVA’s official plant page. Undated station context. Source and credit.
Power generation2.3 GW · 2296 MW electrical capacity. Combined historic reference electrical capacity: 1,148 MWe net per unit; both units shut for recovery. · source