Something missing or wrong? Say it in your own words: a link that backs this pin up, a different start or end date and why, or a fact it lacks or gets wrong. The AI checks it against this pin's sources, searches for better ones, and adds any page that backs you up. The pin's own sources still count most. A picture that shows something else, or shows it badly, is looked at too, and moved down or replaced.
Unit 1 enters long-term shutdown two years after Unit 2.[1]
848 MW electrical capacity. Historical generating capacity; not a claim about current output.[1]
Cost: not assigned. No event-specific published construction/restart budget was verified. Financing, damages and other phases are not substituted.
Photo: Bruce Power. Bruce A Unit 3, from the operator’s 2022 annual report. This provides Bruce A station context and does not depict Unit 1 or Unit 2 restart work. Source and credit.
Translations completed using Gemini 3.8 Flash.
Power generation848 MW · 848 MW electrical capacity. Historical generating capacity; not a claim about current output. · source