- Start
- May 31, 202740% CONFIDENCELow confidencefrom the source
Billings West End Water Treatment Plant Delivers First Water
References 568% CONFIDENCEOverall confidence: 68%How well the pin's source and references back up its dates.Weighted average of how firmly 5 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
The first entry is always the pin's source. Overall confidence is a weighted average of how firmly each reference supports the start and end times used above; a reference counts half as much for every 180 days older than the newest.
- [1]40%ktvq.com/news/billings-75-million-west-end-water-plant-now-scheduled-to-be-finished-may-2027ktvq.com· Posted Sep 30, 2026· Starts May 31, 2027 ✓· 20% of score
The water superintendent says "We'll be delivering water spring of 2027 from the treatment plant" and the headline gives May 2027; the plan was fall 2026.
- [2]75%2026 West End Water Treatment Plant - Billings Public Worksbillingsmtpublicworks.gov· Added Sep 30, 2026· 20% of score
- [3]75%West End water treatment plant moves toward completion - Billings Gazettebillingsgazette.com· Added Sep 30, 2026· 20% of score
- [4]75%West End Water Treatment Plant - Burns & McDonnellburnsmcd.com· Added Sep 30, 2026· 20% of score
- [5]75%Billings starts construction of new water treatment plant and reservoirs - KTVQktvq.com· Added Sep 30, 2026· 20% of score
Suggest a correction
Something missing or wrong? Say it in your own words: a link that backs this pin up, a different start or end date and why, or a fact it lacks or gets wrong. The AI checks it against this pin's sources, searches for better ones, and adds any page that backs you up. The pin's own sources still count most. A picture that shows something else, or shows it badly, is looked at too, and moved down or replaced.