The first entry is always the pin's source. Overall confidence is a weighted average of how firmly each reference supports the start and end times used above; a reference counts half as much for every 180 days older than the newest.
Fire Engineering's[3] industry-news report dates Pierce Manufacturing's Phase I High Flow production line launch at its Appleton campus to March 25, 2026.
Wikipedia corroborates that Pierce, headquartered in Appleton, Wisconsin, is the largest U.S. fire apparatus manufacturer, matching the documentary's 'largest factory' framing.
Fire Engineering's report states Pierce announced the Phase I High Flow line was live at its Appleton campus on March 25, 2026, cutting lead times by more than three months.
Something missing or wrong? Say it in your own words: a link that backs this pin up, a different start or end date and why, or a fact it lacks or gets wrong. The AI checks it against this pin's sources, searches for better ones, and adds any page that backs you up. The pin's own sources still count most.