The first entry is always the pin's source. Overall confidence is a weighted average of how firmly each reference supports the start and end times used above; a reference counts half as much for every 180 days older than the newest.
Opening / first-lease date: opening recorded only to the year (2019) in Pennrose[3][4] Nears Opening Of All-Affordable Apartment Building In Newark (Bisnow, 2018-09-14) + listing-site year built; the pin sits on the last day of that year. Confidence: low. No ribbon-cutting/opening announcement found. HUD LIHTC record 'Montgomery Heights Phase II' (NJA0000X050) has YR_PIS 9999 (unknown). Agency/developer projection (NJHMFA Jul 2017: completion Oct 2018; Pennrose Sep 2018: complete end of 2018, leasing from Oct 2018). Aggregator listings (ApartmentGuide/ApartmentFinder, via search snippets) give 'built 2019', consistent with a slip of the projection; a Feb 2019 photo caption (prior pass) suggested work still underway. Best estimate: opened/first leased in 2019 (possibly very late 2018). Year-only; not a verified day. Treat as low confidence.
Construction research 2026-10-24: The May 2021 permanent-loan report describes Aston Heights as newly constructed with 154 apartments, establishing completion independently of old target dates. Pennrose’s[1][3][4] developer profile hosted in the URA’s 2025 RFQ materials gives US$45 million for the exact 154-home Aston Heights / Montgomery Heights II scope. This rounded project-profile figure is not the US$7.9 million permanent loan. The existing estimated 2019 year anchor remains; the newly opened sources establish completion by 2021 but do not independently establish an exact 2019 opening date. Source quote: “$45M | 154 units” Page 1 (zero-based), Aston Heights, Newark NJ / Montgomery Heights II. Rounded developer profile project figure, not the permanent loan; publication day not established.
Project-specific operator, government or project-partner source reviewed on October 10, 2026.[1]
Project-specific operator, government or project-partner source reviewed on October 10, 2026.[1]
Construction research 2026-10-24: The May 2021 permanent-loan report describes Aston Heights as newly constructed with 154 apartments, establishing completion independently of old target dates. Pennrose’s[1][3][4] developer profile hosted in the URA’s[2] 2025 RFQ materials gives US$45 million for the exact 154-home Aston Heights / Montgomery Heights II scope. This rounded project-profile figure is not the US$7.9 million permanent loan. The existing estimated 2019 year anchor remains; the newly opened sources establish completion by 2021 but do not independently establish an exact 2019 opening date. Source quote: “Aston Heights, a newly constructed mixed-income property”
154 apartments and townhomes.
“154 thoughtfully designed apartment homes and townhomes”
Newly constructed property documented 18 May 2021; this is a reporting milestone, not an inferred completion date.
“newly constructed mixed-income property”
Brick Towers demolished (Aston Heights site)
“it was already beyond repair and was demolished in 2008”
Groundbreaking (Montgomery Heights II, the Aston Heights phase)
“The beginning of construction of the $45.8 million Montgomery Heights II in Newark’s Central Ward was celebrated today”
Planned completion at groundbreaking
“The project is expected to be completed by October 2018.”
Newly constructed property documented
“newly constructed mixed-income property”
Something missing or wrong? Say it in your own words: a link that backs this pin up, a different start or end date and why, or a fact it lacks or gets wrong. The AI checks it against this pin's sources, searches for better ones, and adds any page that backs you up. The pin's own sources still count most. A picture that shows something else, or shows it badly, is looked at too, and moved down or replaced.
The May 2021 permanent-loan report describes Aston Heights as newly constructed with 154 apartments, establishing completion independently of old target dates. Pennrose’s developer profile hosted in the URA’s 2025 RFQ materials gives US$45 million for the exact 154-home Aston Heights / Montgomery Heights II scope. This rounded project-profile figure is not the US$7.9 million permanent loan. The existing estimated 2019 year anchor remains; the newly opened sources establish completion by 2021 but do not independently establish an exact 2019 opening date.
Opening date: opening 2019 (year precision; no exact day published). Source: Pennrose Nears Opening Of All-Affordable Apartment Building In Newark (Bisnow, 2018-09-14) + listing-site year built. Operator listing and program documents were last reviewed October 10, 2026.
Contact the operator to confirm current intake, eligibility and the applicable housing program. A contact form or published price does not establish a vacancy. Leasing phone: 973-860-3157. Application / waitlist information. Eligibility and application document.
Monthly prices shown on the operator’s current property page, checked October 10, 2026. Apartment and program eligibility vary.[1]
| Apartment / condition | Monthly rent |
|---|---|
| 1 bedroom — operator-listed | $1,443 |
| 2 bedroom — operator-listed | $1,731 |
The page does not assign every rate to an income tier. Mixed-income ranges may include market-rate homes. Assisted residents may pay a different income-based contribution. Confirm utilities, fees, qualification and a final quote with leasing.
Eligibility: the linked operator documents identify a Low-Income Housing Tax Credit program. Qualification depends on household size and annual income; voucher and market-rate homes, where offered, use separate rules.
Stated by the source · 154 apartments and townhomes; retail excluded.