Prologis, an industrial real estate investment trust, received unanimous approval in March 2026 to convert a 1,011,808 square foot warehouse they own into a data center at 2500 Liberty Drive. The building was approved for warehouse use in 2016 and completed in 2023, but never occupied. The end tenant is currently undisclosed. The facility will use a closed-loop cooling system, has a privately funded electrical infrastructure including a private substation, and will incorporate solar panels, although no capacity figures have been publicly disclosed. The project is expected to employ between 100 and 120 people.
Arrow Real Estate Services marketed a 155-175 acre off-market proposed data center park at Route 309 and Rich Hill Road in Richland Township, Bucks County, Pennsylvania. The listing describes 5+ buildings totaling over 2 million square feet, 1 GW phased in, and gas co-generation permits in process, with the price on request. No developer, tenant, township application, cost or completion date is published, and the listing page has since been removed. The township was drafting a data center zoning ordinance in mid-2026.
TECfusions is converting the 1,395-acre former Alcoa Technical Center in Upper Burrell, Westmoreland County, Pennsylvania into Keystone Connect, a 1,000 MW AI data center campus with on-site natural gas microgrid generation.
Goodnight in Claude, Texas, United States is a frontier AI data center campus operated by Google / Google DeepMind reaching 1,006 MW of power capacity and 2,278,929 H100-equivalent AI accelerators. Though named after the nearby locale of Goodnight, the data center is actually located in the town of Claude, Texas.
OpenAI Stargate UAE in Abu Dhabi, Abu Dhabi, United Arab Emirates is a frontier AI data center campus operated by G42 / OpenAI reaching 1,000 MW of power capacity and 2,021,223 H100-equivalent AI accelerators. Stargate UAE is the first Stargate cluster outside the U.S.; reported export agreements suggest G42 and/or Oracle can acquire 100,000 state-of-the-art NVIDIA chips per year.
Meta Prometheus in New Albany, Ohio, United States is a frontier AI data center campus operated by Meta reaching 1,022 MW of power capacity and 1,164,337 H100-equivalent AI accelerators. Meta Prometheus is unusual for its ad hoc construction — a patchwork of weatherproof tents, colocation facilities, and traditional data center buildings spanning the full length of New Albany Business Park.