ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 8 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Start is Epoch's[1][3][7] satellite-observed land clearing; Crusoe says construction began June 2024. End is Epoch's estimated November 2026 operation of Buildings 7-8; no developer date is published.OpenAI's Stargate campus in Abilene, Texas, is Crusoe's eight-building, roughly 4 million sq ft, 1.2 GW development leased to Oracle. Construction began in 2024; Oracle reported six of eight buildings delivered on September 10, 2026, with the last two still being fitted out. A $15 billion joint venture funds the campus. Epoch AI estimates 618 MW of IT power now and 824 MW when complete.
$15B
1.00