Broening Highway & Dunmanway, Dundalk, Baltimore County, MD 21222Clean Energy Developers / Baltimore Gas and Electric
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins52% CONFIDENCEOverall confidence: 52%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Maryland[1][3] Public Service Commission CPCN filings and PJM regional interconnection queue agreements set commercial operation for June 2026.The Riverside Energy Storage Project is a 135 MW / 540 MWh 4-hour battery energy storage system located on an industrial parcel near Dundalk in Baltimore County, Maryland. Sited along the Northeast to Riverside 230 kV bulk power corridor operated by Baltimore Gas and Electric (BGE) in PJM Interconnection, the facility provides critical local capacity, peak power replacement, and frequency regulation for the Baltimore industrial and port hub.
1.00