Estimated: Zanker Road near Highway 237, San José, California; approximate STEM Park campus context, not surveyed Building D coordinates
Prologis
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins95% CONFIDENCEOverall confidence: 95%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference, the source included, supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
The event is the October 27, 2025 staff memorandum and its concept plan. No Building D commissioning date is established.[1]San José’s October 2025 staff memorandum includes Prologis’s conceptual Building D: a phase-two, two-story 421,100 sqft data center with 99 MW utility power and 72 MW IT load. It is a concept at the Zanker Road / Highway 237 campus, not an operating building.
1.00