Metro Picks an Underground Subway for the Sepulveda Pass
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins87% CONFIDENCEOverall confidence: 87%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or betterMetro's[1] release dated January 22, 2026 says the Metro Board "selected an underground heavy rail option as the Locally Preferred Alternative (LPA) for the Sepulveda Transit Corridor Project"; Wikipedia[2] gives the full board's unanimous vote at its January 22, 2026 meeting.
The Metro Board chose a fully underground heavy-rail line, Modified Alternative 5, to link the San Fernando Valley with the Westside through the Sepulveda Pass, a trip Metro says will take under 20 minutes.
1.00