ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins56% CONFIDENCEOverall confidence: 56%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Aligned said initial capacity was anticipated 'as early as the fourth quarter' of 2025 (19 Feb 2025 release). The Texas[4] TDLR filing TABS2024018570 lists construction start 6/24/2024 and completion date 1/27/2026; that filing date is used as the estimate. No source found confirms energization; one listing (DataCenterHawk) says commissioned but could not be opened to verify.Aligned Data Centers is building DFW-03, a two-story 429,603 sq ft data center with an on-site substation on 27 acres at 3801 Britton Road, Mansfield (Tarrant County), Texas; the 86.4 MW facility / 72 MW IT figures are Cleanview estimates (Aligned publishes no MW), and the 120.5M USD is the construction cost filed with Texas TDLR.
$120.5M
1.00