第一项始终是图钉的来源。总体可信度是各份资料对上方所用开始和结束时间支持程度的加权平均;资料每比最新的一份旧 180 天,权重减半。
洛杉矶地铁自己的项目页面关于第一段写道:“已于 2026 年 5 月 8 日开通。”
Section 1 only (3.9 mi, 3 stations); earlier search showed board-approved $3.51B.[1]
Openedexact-product/projectrevieworreactionsource;quoteliterallymatchedin6NovPMresearch.[1]
Openedexact-product/projectrevieworreactionsource;quoteliterallymatchedin6NovPMresearch.[1]
有遗漏或错误吗?用你自己的话说明:能佐证此图钉的链接、不同的开始或结束日期及理由,或缺失、有误的信息。AI 会对照此图钉的来源进行核实,搜索更好的来源,并添加任何支持你说法的页面。图钉自身的来源仍然最重要。AI 也会查看图片:显示的是别的东西或显示效果差的图片会被移到后面或替换。
“Section 1 Opened May 8, 2026”
Section 1 is open. Ongoing work on Sections 2 and 3 does not change this section’s completed status.
“Section 1 is now open”
Subway extension from Koreatown to the Wilshire/La Cienega area.
“Section 1 extends the subway from Koreatown to the Wilshire/La Cienega area”
Section 1 passenger opening
“Section 1 Opened May 8, 2026”
The Wilshire Corridor is one of the most heavily traveled routes in the Los Angeles region, and travel between central Los Angeles and the Westside needs improving.
How: Extends subway service west along Wilshire Boulevard in three sections, creating a reliable, high-capacity transit option that improves access and reduces travel time between active job, education, medical and cultural centers.
原标题: Metro's D Line Subway Extension Opens Its First Three Stations