Tabuk Airport, طريق المدينه المنوره, Prince Sultan Bin Abdulaziz International Airport, Tabuk, Tabuk Governorate, Tabuk Province, 47911, Saudi ArabiaFlydubai
The Bay Area Metro Center, 375, Beale Street, Rincon Hill, Financial District, San Francisco, California, 94105, United StatesMetropolitan Transportation Commission
Deutsche Lufthansa Corporate Headquarters, 151, Venloer Straße, Neustadt/Nord, Innenstadt, Cologne, North Rhine-Westphalia, 50672, GermanyLufthansa Group
3市场影响 3/10The FAA stopped all US departures on 13 November after a telecom failure hit its en route centres, then resumed flights that evening; a one-day operational disruption for US airlines, with no lasting effect reported.影响:DAL, UAL, AAL, LUV
Confirmed: Aerocorner[1] reports departures were halted at every US airport from about 3:54 p.m. ET on Friday 13 November 2026, and the FAA said the stop had been lifted by that evening.
Kalshi
Polymarket
On 13 November 2026 the FAA stopped all departures at US airports from about 3:54 p.m. Eastern after a telecommunications failure hit its 22 en route air traffic control centers; flights resumed in the early evening while the cause, reportedly a network update and reboot on an L3Harris-run system, remains unconfirmed. By 14 November Kalshi's cause market had about US$340,000 traded and Polymarket priced an Iran attribution at 1.4%.
ENR[4](2026年8月28日)称该项目“计划于今年11月动工”,Urbanize[5] LA称街景改造工程“仍按计划于11月开始”;由于未给出具体日期,该月份被记录为其最后一天。完工:英格尔伍德市(City of Inglewood)ITC项目计划页面(2026年9月读取):第一阶段的枢纽、Market Street以及赛事日公交车道将“全部在LA28奥运会及残奥会之前”交付,时间表为“2028年第一阶段交付——预计第一阶段将完工”;其边界为LA28开幕式,即2028年7月14日。
重新分期后的 Inglewood Transit Connector 首先建设三座交通枢纽,共提供超过 1,000 个停车位,另有赛事日公交专用道、重建的 Market Street,以及一座跨越 Florence Avenue、通往 Metro K 线车站的人行天桥,均须在 2028 年前完工。原先作为项目起点的自动旅客捷运系统暂缓建设,其在 Market 与 Manchester 的路权予以保留。
Long Thanh International Airport, Đường T1, Khu phố Long An, Long Thanh Ward, Đất Mới – Bà Ký, Xã Long Phước, Đồng Nai, 76213, VietnamAirports Corporation of Vietnam
Construction World[2]于2026年9月16日将年份缩小到具体月份:DMRC“目标于2026年12月开通金线图格拉卡巴德至桑加姆维哈尔之间的首个运营段。这段8.4公里的线路被规划为首段”。12月正是该条目原定年份的最后一个月,因此日期仍为2026年12月31日——如今代表的是一个明确月份的月末,而不仅是一个年份。Aerocity至图格拉卡巴德的整条走廊将随后开通。