第一项始终是图钉的来源。总体可信度是各份资料对上方所用开始和结束时间支持程度的加权平均;资料每比最新的一份旧 180 天,权重减半。
在 en.wikipedia.org[2] 上未找到关于该日期的说明;视为未经核实。
Dates the 2019 selection, 2023 PDR, 2024 launch contract, 2025 CDR, the Jul 5-25, 2028 launch window and 2034 arrival.[1]
NASA's own press release confirms the Dragonfly mission's launch services contract, with SpaceX providing a Falcon Heavy launch in "a targeted launch period from July 5, 2028, to July 25, 2028" - matching the pin's stored 1 July 2028 date to within days.
The Johns Hopkins APL Dragonfly mission's own news update, dated 28 November 2023, reports an "estimated 2028 launch readiness date," consistent with the pin's stored July 2028 date, though the page itself could not be fetched to quote directly.[1]
有遗漏或错误吗?用你自己的话说明:能佐证此图钉的链接、不同的开始或结束日期及理由,或缺失、有误的信息。AI 会对照此图钉的来源进行核实,搜索更好的来源,并添加任何支持你说法的页面。图钉自身的来源仍然最重要。AI 也会查看图片:显示的是别的东西或显示效果差的图片会被移到后面或替换。
通过关键设计审查,全面施工和测试开始
启动窗口开启(截至 2028 年 7 月 25 日)
经过大约六年的航行预计抵达泰坦
原标题: Dragonfly Launches for Titan