第一项始终是图钉的来源。总体可信度是各份资料对上方所用开始和结束时间支持程度的加权平均;资料每比最新的一份旧 180 天,权重减半。
根据该 Pin 的描述,这是目标日期而非固定日期:“……将奇洛埃岛与智利本土连接起来。预估日期。……”
BioBioChile (a Chilean outlet) reports competing official estimates: the minister projecting the bridge "se entregaría en octubre de 2028" (October 2028) while the incoming minister suggests 2029-2030 given post-construction certification, bracketing the pin's stored June 2029 estimated date.
BNamericas, an English-language Latin American trade-press outlet, reports the Chacao Bridge's handover is expected in October 2028, corroborating the pin's existing reference from the Chilean public works ministry that the bridge is targeted for 2028.
有遗漏或错误吗?用你自己的话说明:能佐证此图钉的链接、不同的开始或结束日期及理由,或缺失、有误的信息。AI 会对照此图钉的来源进行核实,搜索更好的来源,并添加任何支持你说法的页面。图钉自身的来源仍然最重要。AI 也会查看图片:显示的是别的东西或显示效果差的图片会被移到后面或替换。
“conectará Chiloé con el continente”
“2029 o incluso en 2030”
原标题: Chacao Channel Bridge Opens