仅突出显示已报告的阶段。数据和日期区分规划与已验证状态。
13,000 people worked on the project, per LeShuttle.
“13,000 people worked on the project”
35 minutes under normal operating conditions; a service journey time rather than passengers/hour.
“journey time of a LeShuttle crossing is 35 minutes”
6 May 1994; distinct from excavation and phased service launches.
“officially opened on 6th May 1994”
50.5 km between Folkestone and Calais; operator’s published rounded length.
UK excavation starts
“December 1987 - Excavation starts”
Official opening
“6th May 1994”
这个标记会跟进新闻:它显示目前已知的情况,这里列出改了什么以及起因。
已编辑由 @ThePinGang
读者上传的照片,与图钉带来源的媒体分开显示。你可以为吃到或看到的内容评分,在餐厅图钉上还能直接在照片上标记菜品。
第一项始终是图钉的来源。总体可信度是各份资料对上方所用开始和结束时间支持程度的加权平均;资料每比最新的一份旧 180 天,权重减半。
已按所标日期发生,来源称:隧道“于 1994 年 5 月 6 日正式开通”,由伊丽莎白二世女王和密特朗总统主持。
Opened primary project source for sourced buildout metrics and project timeline; researched 2026-10-29.[1]
FD Engineering documentary on the Channel Tunnel, the same real-world subject as this pin’s 1994 opening.[1]
Wikipedia confirms the tunnel was "officially opened" on May 6, 1994 by the same two heads of state, while noting full public passenger service did not begin for several months and freight service started June 1, 1994 - matching the pin's stored date while adding useful nuance.
History.com states the Channel Tunnel was opened in "a May 6, 1994 ceremony presided over by England's Queen Elizabeth II and French President Francois Mitterrand," matching the pin's stored date exactly.
有遗漏或错误吗?用你自己的话说明:能佐证此图钉的链接、不同的开始或结束日期及理由,或缺失、有误的信息。AI 会对照此图钉的来源进行核实,搜索更好的来源,并添加任何支持你说法的页面。图钉自身的来源仍然最重要。AI 也会查看图片:显示的是别的东西或显示效果差的图片会被移到后面或替换。
原标题: The Channel Tunnel Opens