A 57-storey concrete-and-glass tower on Paseo de la Reforma, engineered to ride out centuries of predicted earthquakes, topped out as Mexico City's tallest building.
Torre Reforma, at Paseo de la Reforma #483, is a 57-floor, 246 m office tower by LBR&A (Benjamín Romano), completed in 2016 after construction began in May 2008[2][3]
It was the tallest in Mexico from July 2015 to May 2016 (later surpassed by Torre KOI) and the tallest in Mexico City on completion, ahead of Torre BBVA Bancomer and Torre Mayor[3]
Structural design was by Arup and DITEC, with a wind study by the Alan G. Davenport Wind Engineering Group[2][3]
The 2,800 m2 site is small for a building of roughly 87,000 m2[2]
The historic 1930s Casa Austin was conserved as the main entrance[3]
Costanera Center, Providencia, Santiago, ChileCencosud
预估可信度 71%11.7年前The completion year is not settled. Pelli Clarke & Partners' project page gives 2014, while Wikipedia's[2] infobox and text give 2013, with finishing work running into 2014 and the official opening postponed to that year. The architect's 2014 is kept, dated to the last day of the year, but only as an estimate.
Santiago's 300-metre Gran Torre Costanera, nicknamed "the Mordor of Santiago" by critics, topped out in February 2012 and was finished as the tallest building on the continent - a completion its architect dates to 2014 and Wikipedia to 2013.
Avenida Atlântica, Balneário Camboriú, Santa Catarina, BrazilFG Empreendimentos
已确认可信度 82%359天前Happened as dated, per the source[1]: "A construção do Senna Tower teve início no dia 29 de setembro de 2025".
Construction began on the Senna Tower, a supertall residential skyscraper in Balneário Camboriú, Brazil designed to become the tallest residential building on Earth.
已确认可信度 90%16.7年前Guinness World Records[2] and The National both confirm the official opening ceremony took place on January 4, 2010.
Emaar Properties officially opened the 828-meter Burj Khalifa in Dubai, timed to the fifth anniversary of Sheikh Mohammed bin Rashid Al Maktoum's accession to power. The tower took the world's-tallest-building title from Taipei 101 by a record margin.
已确认可信度 90%6.8年前The B1M’s March 2018 video and article described the tower as if newly finished, but construction was still ongoing (topping out was only September 2017); Zaha Hadid[4] Architects’ own announcement and multiple design outlets confirm Leeza SOHO actually opened on 19 November 2019. Happened as dated, per the source[1]: "zaha hadid architects completes 'leeza SOHO tower' in beijing".
Zaha Hadid Architects’ twisting Beijing skyscraper opened with a 194-metre atrium spanning two towers built around a live subway line.
已延期可信度 63%11.2年前The topping out is dated: Wikipedia[2] records the south tower's final slab poured on 24 July 2015, completing its 67 floors and full 216 m as Colombia's tallest building. The north tower's last slab followed on 20 December 2015 and structural work finished on 24 February 2016; the pin's old end-of-2016 date matched none of these. The opening itself kept slipping for years afterwards.
Financed by more than 3,800 small Colombian investors instead of one developer, BD Bacatá reaches its final floor as the country’s tallest building, though its full opening keeps slipping.
已确认可信度 90%4.9年前Happened as dated, per the source[1]: "Skyscrapers taller than 150 meters are not allowed to be built in cities with less than 3 million people".
China's housing ministry tightened its skyscraper rules nationwide, barring any new building over 150m in cities under 3 million people and capping larger cities at 250m.
已确认可信度 87%3.7年前Happened as dated, per the source[1]: "When its spire was completed in 2022, it took the building's height up above 600-metres."
Kuala Lumpur's Merdeka 118 topped out with its spire in place, reaching 678.9m to become the world's second-tallest building and one of only four megatall skyscrapers on Earth.
Estadio Santiago Bernabéu, Madrid, SpainReal Madrid
已延期可信度 60%1.7年前The reopening slipped past several earlier target dates before the stadium was substantially finished going into the 2024/25 season. Happened as dated, per the source[1]: "close to €1.347 billion" had been spent by mid-2025 on the finishing work.
Real Madrid's four-year overhaul of the Santiago Bernabéu — a new steel facade, retractable roof and a fully removable pitch — ran years past its original target before wrapping up.
已确认可信度 88%3.2年前Mori Building gives the Mori JP Tower's completion as 30 June 2023, announced at the start of the following week; CNN[3] of 4 July 2023 reports the completion was 'announced Monday', with final touches left and the Azabudai Hills complex to open in the fall. The previous date of 24 November 2023 was the day the complex opened to the public, not the tower's completion.
Mori Building's earthquake-engineered Main Tower at Azabudai Hills was completed in Tokyo, becoming Japan's tallest building at 330 metres.
已确认可信度 72%14.3年前Happened as dated, per the source[1]: "Tokyo Skytree was completed on Leap Day, 29 February 2012, with the tower opening to the public on 22 May 2012".
Tokyo Skytree, the world's tallest tower at the time and an earthquake-engineering showcase, opened to visitors in Sumida, Tokyo.
预估可信度 62%2.3年后A target, per the source[1]: the tower "is set for completion in December 2028", with no official opening date yet announced.
Dubai developer Muraba and Pritzker Prize-winner RCR Arquitectes are building Muraba Veil, a 380m tower just 22.5m wide wrapped in a porous steel mesh, among the world's skinniest skyscrapers.
Forum des Halles, 101 Porte Berger, 75001 Paris, FranceCity of Paris
已确认可信度 80%10.5年前French outlets Batiactu[3] and Ingélux, and Wikipedia's[2] French edition, date the Canopée's public inauguration to April 5, 2016.
Paris unveiled La Canopée, a sweeping glass-and-steel roof capping the decade-long, roughly 800 million euro renovation of the Forum des Halles shopping and transit hub. Mayor Anne Hidalgo led the inauguration of the structure designed by architects Patrick Berger and Jacques Anziutti.