已排期可信度 76%Given as scheduled, per en.wikipedia.org[1]: "…should begin by 2024, with the project scheduled for completion in 2032.[47] On 31 March, the Itali…"
A proposed 3.3 km single-span suspension bridge linking Sicily to the Italian mainland, which would be by far the longest span ever built. Estimated date.