Near London and Big Plain, Madison County, Ohio, USA (EIA reported plant point)Leeward Renewable Energy
预估日期确定性: 预估目标日期,而非确定日期来源对日期的表述有多确定:已确认、已排期、预估、已推迟或未核实。显示所有“预估”的图钉可信度 95%总体可信度: 95%该图钉的来源和参考资料对其日期的支持程度。包括来源在内的 3 份资料对图钉开始和结束时间支持程度的加权平均;资料每比最新的一份旧 180 天,权重减半显示所有可信度不低于 75% 的图钉
EIA[3] operating month September 2023; LRE says generation began mid-2023. Month precision, exact milestones unresolved.LRE identifies Big Plain as a 196 MW solar project on approximately 1500 acres that began generating in mid-2023. EIA’s August 2026 operating inventory records plant 64635/GEN 01 at 196 MW with September 2023 operation. The prior 600 MW hybrid/$1.2 B/2028 story is removed.
1.00