Confirmed: MISO GI queue API records withdrawnDate 2026-10-20 (2026-10-20T04:00:00+00:00) for request J2966; earlier requested in-service date was 2025-10-15 (pin previously held 2027-10-01).
J2966 is a 450 MW photovoltaic generation interconnection request in Quitman, MS. The grid operator lists its queue status as Withdrawn. The requested in-service date is 2025-10-15; this is a planning date.
Confirmed: MISO GI queue API records withdrawnDate 2026-10-20 (2026-10-20T04:00:00+00:00) for request J3049; earlier requested in-service date was 2024-12-01 (pin previously held 2027-12-01).
J3049 is a 188 MW photovoltaic generation interconnection request in Madison, MS. The grid operator lists its queue status as Withdrawn. The requested in-service date is 2024-12-01; this is a planning date.
Tupelo Clean Energy Solar Station 是一个 150 MWac 公用事业规模光伏发电设施,位于密西西比州李县图珀洛附近的开阔乡村地带。 该项目与田纳西河谷管理局 (TVA) 区域服务范围内的高压输电网互连,提供清洁、零排放的电力,为密西西比州东北部的当地制造、汽车和商业运营提供电力。