Start: Wikipedia[2] records Vistula Spit Canal construction began on 4 October 2019. Completion: the canal was officially inaugurated on 17 September 2022.
Poland opened the Vistula Spit Canal, a new $450M channel letting ships reach the port of Elbląg without passing through Russian-controlled waters near Kaliningrad.