ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins81% CONFIDENCEOverall confidence: 81%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
The Election Commission has not announced a schedule. Kalshi's[1] event ticker is dated April 30, 2029, which matches the 18th Lok Sabha's term ending in June 2029 and the spring polling India has used since 2014; its contracts stay open a year past that.
Kalshi
The 18th Lok Sabha's five-year term runs to June 2029, so India's next general election falls in the spring of that year. Kalshi dates its market to April 30, 2029, and on 20 September 2026 it had Narendra Modi at 51%, Yogi Adityanath at 19% and Rahul Gandhi at 6.5%.
Allen Acres Solar EIA plant 70055 reporting point, Allen Township / Ransom area, LaSalle County, Illinois; approximate project contextAvangrid Power LLC
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins95% CONFIDENCEOverall confidence: 95%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
May 1 is month-only precision for EIA’s[1] proposed May 2029 operation. Parent construction-start approval does not confirm commissioning or replace the target with a research date.
EIA plant 70055 lists Avangrid Power LLC’s Allen Acres Solar in LaSalle County at 150 MW, targeting May 2029. Iberdrola’s September 2026 results instead describe approval to start construction of a 210 MW Allen Acres project; the rating basis is unspecified.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins95% CONFIDENCEOverall confidence: 95%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Estimated commercial operation target of May 2029 based on planned campus phase schedule and utility power delivery filings.[1]
Amazon Web Services has progressed master site planning and Pacific Power substation engineering for Phase 3 of its 2.5B USD, 300 MW Wallula Gap Hyperscale Campus in Walla Walla County, Washington.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins95% CONFIDENCEOverall confidence: 95%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Estimated commercial operation target of May 2029 based on MISO generator interconnection queue schedule and state regulatory filings.[1]
Northern Indiana Public Service Company (NIPSCO) has filed IURC certificate petitions and completed MISO DPP studies for the 720M USD, 700 MWac Reynolds - Burr Oak Clean Solar Project in Pulaski County, Indiana.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins95% CONFIDENCEOverall confidence: 95%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Estimated commercial operation target of May 2029 based on regional grid generator interconnection queue schedule and state regulatory filings.[1]
Enlight Renewable Energy has advanced Oregon EFSC Site Certificate review and BPA transmission studies for the 820M USD, 800 MWac Cedar Island Solar Project in Lake County, Oregon.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins95% CONFIDENCEOverall confidence: 95%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
May 15, 2029 is ERCOT[1] projected COD, not actual service.
ERCOT September 2026 GIS identifies Amphion Solar Phase 2 as request 28INR0343, Amphion Solar LLC, 205.9 MW in Atascosa County, targeting May 15, 2029. Screening is complete and full study started without an IA; construction is not established.
10018 E Jensen Ave, Sanger, Fresno County, California, United StatesNew Leaf Energy
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins63% CONFIDENCEOverall confidence: 63%How well the pin's source and references back up its dates.Weighted average of how firmly 5 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
CAISO queue 1930 lists a proposed operating date of 21 May 2029 (via Cleanview[3] and interconnection.fyi[2]); no developer or utility source gives a date.
Apache Energy Storage 1, LLC (listed by Cleanview under New Leaf Energy) plans a lithium-ion battery of about 200 MW (203.7 MW in the CAISO queue) on 11.3 acres near Sanger, Fresno County; the county approved the permit in May 2023 and no cost has been published.
DELAYEDDate confidence: DELAYEDThe date has movedHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all DELAYED pins4 years late60% CONFIDENCEOverall confidence: 60%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
ERCOT queue request 23INR0066 (via Cleanview[3]) lists 31 May 2029; Westbridge's last statement (11 May 2023) targeted Q2 2025, and no later developer update was found.
Westbridge Energy's Accalia Point Solar is a 221 MWp (190.5 MW in the ERCOT queue) solar project on about 1,120 acres in Cameron County, Texas, still in development with no published cost; the company last updated it in 2023.
Austin County, Texas; retained approximate county/project-area point, not a verified battery parcelAgricola BESS LLC
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins95% CONFIDENCEOverall confidence: 95%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
May 31, 2029 is ERCOT[1] projected COD; construction and actual operating date are unverified.
ERCOT September 2026 GIS identifies Agricola BESS LLC request 28INR0265 in Austin County: 205.2 MW, May 31, 2029 projected COD, screening complete and full study started without an interconnection agreement.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins95% CONFIDENCEOverall confidence: 95%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Unverified legacy June 2029 estimate. Opened federal permitting/project records establish proposed scope and review, not COD.[1]
The federal permitting dashboard describes Mosey as 500 MW solar with up to 850 MW battery storage in Pahrump Valley. These are proposed capacities under environmental review; the previous 544 MW scope and $1.25 billion budget were not substantiated.
AC Ranch II EIA plant 68579 reporting point, Lea County, New Mexico; shared reporting point with AC Ranch I, not a surveyed Phase II boundaryLydian Energy
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins95% CONFIDENCEOverall confidence: 95%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
June 1 is month-only precision for EIA’s[1] June 2029 proposed AC Ranch II operation, not confirmed COD.
EIA plant 68579 lists Lydian Energy’s AC Ranch II in Lea County as 230 MW solar, with approvals pending and June 2029 proposed operation. This is separate from the 75 MW AC Ranch I plant 68578, even though their reported coordinates match.
Arida Solar Hybrid EIA plant 63841 reporting point, southern Clark County near Laughlin, Nevada; approximate project context326FW 8me LLC
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins95% CONFIDENCEOverall confidence: 95%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
June 1 is month-only precision for EIA’s[1] June 2029 proposed operation. CAISO[2] September 2027 and old PUCN 2024 expectations conflict; none proves actual operation.
EIA plant 63841 lists 326FW 8me LLC’s Arida hybrid near Laughlin with a 370 MW battery and separate 370 MW solar unit. CAISO queue 1522 lists 370 MW combined export; neither component should be added to the other as export capability.
Google Lincoln Campus Building 4, North 56th Street & Interstate 80 Corridor, Lincoln, Lancaster County, NE 68528Google LLC
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins94% CONFIDENCEOverall confidence: 94%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Estimated commercial operation target of June 2029 based on planned campus phase schedule and utility power delivery filings.[1]
Google development of Building 4 at its Lincoln Hyperscale Data Center Campus in Lancaster County, Nebraska. Adding 156 MW of computational power capacity, the building incorporates dedicated high-voltage utility feeds, resilient battery backup arrays, and dense fiber connectivity to expand Google's Midwestern cloud region.
Project Bluestem Campus Building 5, 158th Street Corridor, Basehor, Leavenworth County, KS 66007Cloverleaf Infrastructure
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins94% CONFIDENCEOverall confidence: 94%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Estimated commercial operation target of June 2029 based on planned campus phase schedule and utility power delivery filings.[1]
Cloverleaf Infrastructure development of Building 5 within the Project Bluestem Hyperscale Campus in Leavenworth County, Kansas. Supplying 240 MW of critical power capacity, the facility integrates dedicated high-voltage utility distribution from Evergy and scalable power topologies for enterprise cloud and AI infrastructure.
Rowan Percheron Data Center Campus Building 3, Tower Road & East Columbia Avenue Corridor, Boardman, Morrow County, OR 97818Rowan Digital Infrastructure
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins95% CONFIDENCEOverall confidence: 95%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Rowan Digital Infrastructure Percheron multi-building schedule and Morrow County land-use filings place Building 3 (84 MW) in 2029 commercial operation.[1]
Rowan Digital Infrastructure development of Building 3 at the Percheron Hyperscale Data Center Campus near Boardman in Morrow County, Oregon. Delivering 84 MW of critical IT load in phase three of the Percheron buildout, Building 3 connects to high-capacity Pacific Northwest fiber and renewable power corridors.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins95% CONFIDENCEOverall confidence: 95%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Estimated commercial operation target of June 2029 based on ERCOT[2] generator interconnection queue schedule and state regulatory filings.
Prairie Point Energy Storage LLC has advanced ERCOT interconnection study agreements for the 950M USD, 1,000 MW / 4,000 MWh Prairie Point Energy Storage Center Phase II in Wise County, Texas.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins95% CONFIDENCEOverall confidence: 95%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Estimated commercial operation target of June 2029 based on ERCOT[2] generator interconnection queue schedule and state regulatory filings.
Key City Solar LLC has secured ERCOT Standard Generation Interconnection Agreements (SGIA) and county approvals for the 950M USD, 989 MWac Key City Clean Solar Facility in Taylor County, Texas.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins70% CONFIDENCEOverall confidence: 70%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Given as a target, not a fixed date, per the pin description: "…enhagen rail travel to about 2.5 hours. Estimated date.…"
An 18 km immersed tunnel under the Baltic links Denmark and Germany, cutting Hamburg to Copenhagen rail travel to about 2.5 hours. Estimated date.
North of Glenrock near Rolling Hills, Converse County, WyomingBrightNight
DELAYEDDate confidence: DELAYEDThe date has movedHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all DELAYED pins3 years late76% CONFIDENCEOverall confidence: 76%How well the pin's source and references back up its dates.Weighted average of how firmly 6 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Cowboy State Daily[5][6], 6 Aug 2026: expected completion "2029" with construction now starting in Q3 2027; Cleanview[3] lists June 2029. Month is Cleanview's.
BrightNight's proposed US$500 million, 499 MW Dutchman solar-plus-battery farm on about 4,700 acres near Glenrock, Wyoming, holds state siting approval but has slipped from a July 2026 start to construction in late 2027 and completion around 2029 because it has no buyer or interconnection plan.
4701 North First Street, San Jose (Alviso), California, USATerra Ventures
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins95% CONFIDENCEOverall confidence: 95%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Unverified legacy June 2029 COD; opened primary design and environmental sources do not publish commissioning.[1]
Arcadis describes Terra Ventures’ planned San Jose campus with a 295,080-square-foot data-center/power structure and a separate 131,903-square-foot power structure. CPUC’s November 2025 environmental record places Terra at 4701 North First Street, San Jose, correcting the former Santa Clara city location.
Shiloh Boulevard & Deborah Avenue, Zion, Lake County, IL 60099Calpine Corporation
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins95% CONFIDENCEOverall confidence: 95%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Estimated commercial operation target of June 2029 based on PJM[2] generator interconnection queue schedule and state regulatory filings.
Calpine Corporation has secured PJM facility study approvals and local zoning review for the 1.2B USD, 1,206 MW / 4,824 MWh Aurora Energy Storage Center in Lake County, Illinois.
Abeja Solar Farm EIA plant 68347 reporting point, Bee County, Texas; approximate project contextAbeja Solar Farm LLC
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins95% CONFIDENCEOverall confidence: 95%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
June 7, 2029 is the later ERCOT[1] projected COD; EIA[2] July 2028 conflicts. Neither date is confirmed operation.
EIA plant 68347 lists Abeja Solar Farm LLC’s Bee County project at 200 MW, with July 2028 proposed operation and approvals not initiated. The later September 2026 ERCOT GIS request 27INR0372 instead reports 200.84 MW and June 7, 2029 projected COD.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins95% CONFIDENCEOverall confidence: 95%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Current SPP[1] requested COD June 15, 2029; not confirmed operation.
SPP lists GEN-2018-048 as 300 MW solar in Caddo County, Oklahoma, connecting at Pecan Creek 345 kV Substation with June 15, 2029 proposed COD and IA fully executed/on-schedule status. The queue does not establish an Invenergy-branded project or local permit.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins70% CONFIDENCEOverall confidence: 70%How well the pin's source and references back up its dates.Weighted average of how firmly 5 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Blizzard[1][5]: "Diablo V is officially in development and coming Spring 2029." Dated to the last day of spring.
Blizzard's next mainline Diablo, set in a Sanctuary where Diablo has already won, is targeted for Spring 2029.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins71% CONFIDENCEOverall confidence: 71%How well the pin's source and references back up its dates.Weighted average of how firmly 6 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Longroad said in January 2026 that construction would start in 2027 and operation in 2029 (Western Mass News[5], 12 Jan 2026; MassLive via Fire Engineering[4], 13 Jan 2026); ISO-NE queue 1365 lists a proposed completion of 30 June 2029.
Longroad Energy's Agawam Energy Center is a 250 MW, four-hour lithium-ion battery at 769 Silver Street, a former lumber yard in Agawam, Massachusetts, which the developer described in January 2026 as a multi-hundreds-of-millions-of-dollars investment (no figure published), with construction planned for 2027 and operation in 2029.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins95% CONFIDENCEOverall confidence: 95%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference, the source included, supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Unverified legacy June 2029 COD; official interconnection table is not a construction schedule.[1]
Illinois Commerce Commission’s February 2025 PJM table lists storage requests AH2-089/090/091 with 1200 MW maximum facility output, zero added energy MW and 50 MW capacity each. Those interconnection quantities do not verify a standalone 1200 MW/4800 MWh BESS or$900 M budget.