Lancaster Clean Solar Energy Project, US Highway 77 & Saltillo Road Corridor, Lincoln, Lancaster County, NE 68516
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
2029-09-01 is the interconnection record’s requested in-service date, not a verified opening or commercial-operation day.
GEN-2021-049 is a 225 MW photovoltaic generation interconnection request in Lancaster, NE. The grid operator lists its queue status as IA FULLY EXECUTED/ON SCHEDULE. The requested in-service date is 2029-09-01; this is a planning date.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins60% CONFIDENCEOverall confidence: 60%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference, the source included, supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Proposed completion date comes from the PJM queue listing (aggregator interconnection.fyi[1]); no firm construction schedule was verified.
Bealeton Solar, LLC has a 14 MW solar project in the PJM interconnection queue (AH1-345) in Fauquier County, Virginia, queued in September 2021. The queue lists a proposed completion date of September 1, 2029.
Towns of Oasis, Hancock, Plainfield and Deerfield, Waushara County, WIDawn Break Solar, LLC
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
September 2029 is the planned operating date in EIA-based data (interconnection.fyi[2]); the PSC approval was reported by RENEW Wisconsin[1] but no construction schedule was found.
Dawn Break Solar is a hybrid project in Waushara County, Wisconsin, pairing a 180 MW solar farm with a battery energy storage system. The Public Service Commission of Wisconsin approved it on July 30, 2026, and EIA data lists a planned September 2029 operating date.
SCHEDULEDDate confidence: SCHEDULEDGiven as scheduledHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all SCHEDULED pins82% CONFIDENCEOverall confidence: 82%How well the pin's source and references back up its dates.Weighted average of how firmly 6 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
The report states the line "is expected to start operations on 9-9-2029, the Roads and Transport Authority (RTA[3]) announced", a fixed announced day chosen to echo the metro's own 9-9-2009 opening.
The 30 km Blue Line adds 14 stations across Dubai Silicon Oasis, Academic City, International City, Dubai Creek Harbour, Mirdif and Al Warqa, with 15.5 km of underground track and 14.5 km elevated. The RTA awarded the construction contract to a consortium of MAPA, LIMAK and CRRC in December 2024 and expects 28 trains to carry 200,000 riders a day by 2030, rising to 320,000 by 2040.
Tin Top Road & Old Dennis Road, Weatherford, Parker County, TX 76087Nabla Park LLC
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
ERCOT[1] September 2026 row 1284, queue 27INR0571 projected COD; estimate with no IA.
ERCOT September 2026 lists Nabla Energy Storage I (27INR0571), Nabla Park LLC, at 750.0 MW and projected COD 2029-09-17, with screening complete, FIS started and no IA. The pin’s capacity-scaled cost and four-hour duration are unverified and cleared.
Duval County, Texas; Esri county-label point for coarse county context, not the project parcel or Cruce–San Miguel tapApricot Sun Energy Center, LLC
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
ERCOT September 2026 GIS identifies Apricot Sun Solar as 29INR0124, Apricot Sun Energy Center LLC, 200.84 MW in Duval County, targeting September 30, 2029. Screening is complete and full study started, without an IA.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
RCRC’s[1] approved-design release targets Q4 2029. October 1 is an estimated quarter anchor, not an announced opening day. Prequalification is not physical construction.
The 92,000-seat stadium rises in northern Riyadh along King Salman Road next to King Abdulaziz Park, its Populous design drawing on the surrounding mountainous landscape. It will be the Saudi national team's headquarters and the venue for the opening match and final of the 2034 World Cup, with a masterplan that adds an athletics stadium, training pitches and an aquatics centre with an Olympic-sized pool.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins45% CONFIDENCEOverall confidence: 45%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference, the source included, supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 49% confidence or below
Proposed completion date is from EIA-860M data via an aggregator.[1]
Crooked Trail Solar is a planned 68 MW solar project in Penobscot County, Maine, with a proposed completion of October 2029 in EIA-based data. The listed operator is VCP Realty, LLC. No town-level site or official source was found.
About 10 miles southwest of Maupin, Wasco County, Oregon (Maupin town point used for coordinates)BrightNight
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Preliminary Application for Site Certificate (Dec 2025/Jan 2026), Background Information exhibit: construction targeted to start Q2 2027 after the site certificate, 24 to 32 months long, "Commercial Operations Date expected by Q4 2029".[1]
BrightNight's Deschutes Solar and Battery Energy Storage System in Wasco County, Oregon is a proposed 1,000 MW solar plant with up to 4,000 MWh of storage (BrightNight's page says up to 1,000 MWh) under state siting review since a January 2026 application; no cost has been published.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins45% CONFIDENCEOverall confidence: 45%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference, the source included, supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 49% confidence or below
October 2029 is the EIA-860M proposed completion date via interconnection.fyi[1]; no developer or regulator source confirms it.
EIA-860M lists Lower Snake Solar Generation BESS, owned by LOSN, LLC, as a planned 600 MW two-unit plant in Garfield County, Washington, with a proposed completion of October 2029. Aggregators split it into a 300 MW solar unit and a 300 MW battery unit; no primary source was found.
Centre Block, Parliament Hill, Ottawa, Ontario, Canada
SCHEDULEDDate confidence: SCHEDULEDGiven as scheduledHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all SCHEDULED pins75% CONFIDENCEOverall confidence: 75%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference, the source included, supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
The Canada Elections Act fixes polling day as the third Monday of October in the fourth calendar year after the previous election, which is October 15, 2029; Kalshi's[1] event ticker carries the same date.
Kalshi
Canada's fixed-date law puts the next general election on the third Monday of October 2029, which is October 15. On 20 September 2026 Kalshi had the Liberal Party at 60%, the Conservative Party at 38% and the NDP at 3.5%; a lost confidence vote would bring the date forward.
Estimated: Dodd Road & US Highway 12, Wallula, Walla Walla County, WA 99363Amazon Web Services (AWS)
UNVERIFIEDDate confidence: UNVERIFIEDNo wording about the date was foundHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all UNVERIFIED pins40% CONFIDENCEOverall confidence: 40%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 49% confidence or below
Separate construction cost, IT power, floor area and an opening date for this building or phase have not been verified. Published campus figures do not establish independent component figures.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins58% CONFIDENCEOverall confidence: 58%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Date is the SPP queue proposed completion (2029-11-15) mirrored by interconnection.fyi[1] and Cleanview[2]; no developer-confirmed schedule.
A 500 MW solar project in the SPP queue (GEN-2018-043) in Burt County, Nebraska, interconnecting at the Ft. Calhoun - Raun 345 kV line with OPPD. Queue date is May 29, 2018 and proposed completion November 15, 2029.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins55% CONFIDENCEOverall confidence: 55%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
The November 1, 2029 date is the proposed completion date on the MISO queue entry J3957 as shown by interconnection.fyi[1][2]; no developer schedule or approval was found.
A 300 MW solar project is active in the MISO interconnection queue in Sullivan County, Missouri, with a proposed completion date of November 1, 2029. The queue entry carries no public project name or developer, and the date is a queue estimate.
Wasco County, Oregon (about 10 miles southwest of Maupin)BrightNight
UNVERIFIEDDate confidence: UNVERIFIEDNo wording about the date was foundHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all UNVERIFIED pins40% CONFIDENCEOverall confidence: 40%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 49% confidence or below
BrightNight subsidiary DECH bn, LLC proposes a 1,000 MW solar facility with a battery system of up to 4,000 MWh in south Wasco County, Oregon, roughly 10 miles southwest of Maupin. A preliminary Application for Site Certificate was received by the Oregon Department of Energy on January 9, 2026.
Estimated: Atascosa County, Texas; retained approximate county/project-area context, not a verified Phase 3 parcelAmphion Solar, LLC
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
ERCOT[1] projected COD, not confirmed construction or operation.
ERCOT September 2026 GIS identifies Amphion Solar Phase 3 as 28INR0344: 115.4 MW, Amphion Solar LLC, Atascosa County, targeting November 15, 2029. Screening is complete and full study started, with no IA reported.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
December 1 is a month-only placeholder for NYISO's[3] reported 12-2029 requested COD (queue file could not be re-opened on 2026-11-02); EIA's[4] September 2026 preliminary inventory and interconnection.fyi[1] instead list planned operation in December 2028, so the date is unresolved between sources and is not a confirmed day.
Swift Current lists Mineral Basin as a 402 MW solar development in Clearfield County, Pennsylvania, interconnected with NYISO. NYISO request 1080 records 401.6 MW and December 2029 requested commercial operation.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Developer coverage (PV Tech[1], May 2026) gives only a 2029 commercial operation target; the SPP queue aggregator lists a proposed COD of 2029-12-01.
Solstice is a 250 MWdc solar project being developed by Enlight's US subsidiary Clenera Holdings in LeFlore County, Oklahoma, with 200 MWac contracted to Google under a power purchase agreement. A second phase is planned to add 800 MWh of battery storage. Construction is expected to begin in 2028 with commercial operation targeted for 2029.
Estimated: Dega EIA plant 68332 reporting point, Talladega County, Alabama; approximate project contextDEGA bn, LLC
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
December 1 is month-only precision for the EIA[1][2] December 2029 proposal, not confirmed COD.
EIA identifies DEGA bn, LLC’s Dega Solar and Storage plant 68332 in Talladega County, Alabama, with separate 200 MW photovoltaic and 200 MW battery units. Both are planned for December 2029, with approvals pending and not under construction.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins53% CONFIDENCEOverall confidence: 53%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
EIA-860M proposed date shown by interconnection.fyi[1] and Cleanview[2] (December 2029); no firm date.
Caverns Solar is a planned 75 MW solar PV plant in Jackson County, Florida, listed in EIA-860M data with operator CVSO, LLC and a proposed completion of December 2029. No developer announcement or site was found.
Estimated: North of Hollister Municipal Airport between Highway 156 and Highway 25, San Benito County, CA (approximate)Longroad Energy
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 6 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Longroad's project timeline graphic shows "Near End of 2029: Operations Commence" after construction starts at the end of 2027; the CAISO queue (entry 1921) lists a proposed COD of 15 December 2030 and MCE reports delivery starting in 2031, and the county hold makes every date uncertain.[1]
Longroad Energy proposes the Allium project north of Hollister, California: 110 MW of solar plus a 110 MW four-hour battery on about 945 acres, contracted to MCE; the county application is on hold under an energy-storage moratorium and no cost has been published.
Stagecoach LRE Solar Facility, Interstate 25 Corridor, Pueblo, Pueblo County, CO 81004Longroad Energy
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Estimated commercial operation target of December 2029 based on regional grid generator interconnection queue schedule and state regulatory filings.[1]
Development of the Stagecoach LRE Clean Solar Project in Pueblo County, Colorado. Generating 230 MWac of clean photovoltaic power, the facility interconnects directly to the regional high-voltage transmission grid to replace retiring coal generation with zero-carbon renewable power across southern Colorado.
Town of Alfred, Allegany County, New York, United States (EIA 860M site coordinates)Northland Power
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
EIA’s[2] September 2026 preliminary inventory records a forecast operation month 2029-12. The first day of December 2029 is an estimated month-only display marker, not an exact opening day. The forecast does not prove physical completion and can change in later monthly inventories.
EIA’s September 2026 preliminary inventory identifies Alfred Oaks Solar, LLC, plant 66675, in Allegany County, NY, with 115.2 MW electrical generation nameplate. The listed stage is (P) Planned for installation, but regulatory approvals not initiated. Operation is forecast for 2029-12; this is a preliminary survey estimate, not an achieved opening or capacity commitment.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins55% CONFIDENCEOverall confidence: 55%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
December 1, 2029 is the proposed completion date on PJM queue entry AH1-260 as shown by interconnection.fyi[1][2]; no developer schedule found.
Haddy Energy Storage LLC has a 300 MW battery project active in the PJM queue (AH1-260) in Camden County, New Jersey, with a proposed completion date of December 1, 2029. No permit, site or construction information was found.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
EIA[1] Phase 1 December 2029 month precision, corroborated only at year level by issuer; Phase 2 target 2030.
TerraForm’s February 2026 announcement confirms acquisition of Steward Creek from Hexagon, describing a 1.56 GW development and a 600 MW interconnection agreement. Phase 1 targets 2029 operation, followed by Phase 2 in 2030. The $1.4B budget is not published.
Estimated: Project Bluestem Campus Building 6, 158th Street Corridor, Basehor, Leavenworth County, KS 66007Cloverleaf Infrastructure
UNVERIFIEDDate confidence: UNVERIFIEDNo wording about the date was foundHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all UNVERIFIED pins40% CONFIDENCEOverall confidence: 40%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 49% confidence or below
Separate construction cost, IT power, floor area and an opening date for this building or phase have not been verified. Published campus figures do not establish independent component figures.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins51% CONFIDENCEOverall confidence: 51%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Given as a target, not a fixed date, per the pin description: "…ant to backstop Australia's renewables. Estimated date.…"
A 2,200 MW underground pumped-storage scheme linking two existing reservoirs, meant to backstop Australia's renewables. Estimated date.
Swiss Valley Energy Storage Facility, State Route 20A & Meyer Transmission Corridor, Warsaw, Wyoming County, NY 14569Sawhall Energy Storage LLC
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
2029-12 is the requested commercial-operation month in NYISO[1][3]. Day 01 is only a month-precision anchor, not an announced commissioning day.
C24-352 is a 300 MW battery storage interconnection request in Wyoming, NY. The grid operator lists its queue status as Active interconnection request. The requested in-service date is 2029-12-01; this is a planning date.