Proposed COD from the SPP queue entry as shown by the Infrasure[1] aggregator.
Elk Solar is a proposed 400 MW solar project in Elk County, Kansas, in the SPP interconnection queue as GEN-2024-125. It would connect to the Neosho Ridge - Caney River 345 kV line with a proposed commercial operation date of June 2028.