ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins50% CONFIDENCEOverall confidence: 50%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference, the source included, supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Estimated construction completion: approximate calendar placement from the published year, month, or season; the selected day is a placeholder, not a verified event day. This is not an opening date.[1]
Microsoft describes Ginger East as being built by Weitz Construction, with construction completion forecast for mid-2028. Completion does not establish operational availability; the exact parcel is unverified.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins60% CONFIDENCEOverall confidence: 60%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Date is the EIA Form 860M proposed completion (June 2028) relayed by interconnection.fyi[1].
Laurens Solar is a planned 150 MW solar plant in Laurens County, Georgia, operated by Laurens Solar I, LLC. EIA data list a proposed completion of June 2028.
1657 Alviso-Milpitas Road, San Jose, CA 95002Microsoft
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
June 1, 2028 remains an unverified legacy tracker estimate, not an operator-published COD. Microsoft[2] confirms physical work, but its summer-2026 site-preparation target is not full data-center opening.
The California Energy Commission identifies Microsoft’s two-building San Jose project at 1657 Alviso-Milpitas Road, with a maximum electrical load of 99 MW and estimated load of 77 MW. A verified total project budget and COD remain unavailable.
Estimated: Project Bluestem Campus Building 3, 158th Street Corridor, Basehor, Leavenworth County, KS 66007Cloverleaf Infrastructure
UNVERIFIEDDate confidence: UNVERIFIEDNo wording about the date was foundHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all UNVERIFIED pins40% CONFIDENCEOverall confidence: 40%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 49% confidence or below
Separate construction cost, IT power, floor area and an opening date for this building or phase have not been verified. Published campus figures do not establish independent component figures.
Estimated: Google Lowcountry Campus Building 11, Mount Holly Commerce Park & U.S. Highway 52, Moncks Corner, Berkeley County, SC 29461Google LLC (Alphabet Inc.)
UNVERIFIEDDate confidence: UNVERIFIEDNo wording about the date was foundHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all UNVERIFIED pins40% CONFIDENCEOverall confidence: 40%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 49% confidence or below
Separate construction cost, IT power, floor area and an opening date for this building or phase have not been verified. Published campus figures do not establish independent component figures.
Estimated: AWS Boardman Airport Data Center Campus Building 4, Tower Road & Port of Morrow Industrial Park, Boardman, Morrow County, OR 97818Amazon Web Services
UNVERIFIEDDate confidence: UNVERIFIEDNo wording about the date was foundHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all UNVERIFIED pins40% CONFIDENCEOverall confidence: 40%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 49% confidence or below
Separate construction cost, IT power, floor area and an opening date for this building or phase have not been verified. Published campus figures do not establish independent component figures.
Wilson County, Texas, United States (south of San Antonio)Advanced Power
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 7 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
EIA’s[2] September 2026 preliminary inventory records a forecast operation month 2028-06. The first day of June 2028 is an estimated month-only display marker, not an exact opening day. The forecast does not prove physical completion and can change in later monthly inventories.
EIA’s September 2026 preliminary inventory identifies Alina Energy LLC, plant 67250, in Wilson County, TX, with 200 MW electrical generation nameplate. The listed stage is (P) Planned for installation, but regulatory approvals not initiated. Operation is forecast for 2028-06; this is a preliminary survey estimate, not an achieved opening or capacity commitment.
Route 6 and Gun Club Road, Morris, Grundy County, Illinois, United StatesTract
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 5 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Bisnow[5] (27 Jan 2026): "Initial energization is targeted for June 2028"; Tract's FAQ hosted by the City of Morris: "Initial power delivery to the site is expected in Q2 of 2028". Full 1 GW load ramp by 2032 per Bisnow.
Tract bought a 343-acre zoned site in Morris, Grundy County, Illinois in January 2026 for a campus of up to 1,000 MW (1GW) with ComEd power, initial energization targeted for June 2028; the land cost about 51.5M USD and no project cost has been published.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Unverified legacy June 2028 COD. Current operator says construction could begin as early as 2028, not operation.[1]
Alcove’s current project page describes Project Catalyst with MDH Partners: 283 acres, up to seven buildings and approximately 3.3 million square feet, scaling toward 500-plus MW. Construction could start as early as 2028 after approvals; that is not an opening date.
Jackson County Hyperscale Campus, Widows Creek Site, Bridgeport, AL 35740
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Estimated commercial operation target of June 2028 based on planned campus phase schedule and utility power delivery filings.[1]
Google LLC expansion of the Jackson County Hyperscale Computing Campus situated at the former Widows Creek coal plant site in Bridgeport, Jackson County, Alabama. Building 3 encompasses approximately 350,000 square feet delivering 150 MW of dedicated critical IT compute capacity powered through dedicated clean energy PPAs with Tennessee Valley Authority (TVA).
Wilson County, Texas; retained EIA 67250 rounded reporting point, not a surveyed phase boundaryAdvanced Power
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
June 1 is month-only precision for EIA[2] June 2028; operator publishes year 2028 without an exact day. Neither is COD evidence.
Advanced Power’s current portfolio describes Alina in Wilson County as proposed solar-plus-storage, with a 200 MW / 400 MWh battery, 222 MWdc solar and 2028 target operation. EIA plant 67250 lists separate 200 MW battery and solar generators, with June 2028 target and approvals not initiated.
Estimated: Google Lincoln Campus Building 3, North 56th Street & Interstate 80 Corridor, Lincoln, Lancaster County, NE 68528Google LLC
UNVERIFIEDDate confidence: UNVERIFIEDNo wording about the date was foundHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all UNVERIFIED pins40% CONFIDENCEOverall confidence: 40%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 49% confidence or below
Separate construction cost, IT power, floor area and an opening date for this building or phase have not been verified. Published campus figures do not establish independent component figures.