Estimated: Google Lincoln Campus Building 6, North 56th Street & Interstate 80 Corridor, Lincoln, Lancaster County, NE 68528Google
UNVERIFIEDDate confidence: UNVERIFIEDNo wording about the date was foundHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all UNVERIFIED pins40% CONFIDENCEOverall confidence: 40%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 49% confidence or below
Separate construction cost, IT power, floor area and an opening date for this building or phase have not been verified. Published campus figures do not establish independent component figures.
Estimated: QTS York County Campus DC9, Hands Mill Highway & Campbell Road Corridor, Rock Hill, York County, SC 29745QTS Data Centers (Blackstone)
UNVERIFIEDDate confidence: UNVERIFIEDNo wording about the date was foundHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all UNVERIFIED pins40% CONFIDENCEOverall confidence: 40%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 49% confidence or below
Separate construction cost, IT power, floor area and an opening date for this building or phase have not been verified. Published campus figures do not establish independent component figures.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins61% CONFIDENCEOverall confidence: 61%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Given as a target, not a fixed date, per en.wikipedia.org[1]: "...is still expected to open in 2031..."
The first fully driverless metro in the United States, reaching Pearl Harbor and downtown Honolulu in its final phase. Estimated date.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins63% CONFIDENCEOverall confidence: 63%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Proposed completion date in MISO queue entries J4153/J4240 via interconnection.fyi[1][2].
A 250 MW battery project in the MISO queue at the Big Stone South 345 kV substation in Grant County, South Dakota, with a proposed completion of June 2031. Developer and energy (MWh) are not published; a second 250 MW entry (J4240) sits at the same substation.
UNVERIFIEDDate confidence: UNVERIFIEDNo wording about the date was foundHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all UNVERIFIED pins40% CONFIDENCEOverall confidence: 40%How well the pin's source and references back up its dates.Weighted average of how firmly 6 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 49% confidence or below
ESA's mission to Ganymede, Callisto and Europa, ending as the first spacecraft to orbit a moon of another planet. Scheduled date.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins62% CONFIDENCEOverall confidence: 62%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Given as a target, not a fixed date, per en.wikipedia.org[1]: "…, Plenary Americas, and Webuild) with a projected in-service date of 2031.[37] The contract was valu…"
A 15.6 km automated subway across Toronto with 15 stations, built to relieve the overloaded Line 1. Estimated date.
Estimated: East of State Route 241 and north of Interstate 82, about 11 miles north of Prosser, Benton County, Washington (approximate)BrightNight
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 6 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Only Cleanview's[4] September 2031 expected date; neither BrightNight nor EFSEC publishes a construction or operating date, and the applicant's 28 October 2025 letter asks for review to continue to 22 December 2026.
BrightNight's Hop Hill project would put up to 500 MW of solar and up to 500 MW of battery storage on about 5,000 acres in Benton County, Washington; Washington's siting council ruled it inconsistent with county zoning on 15 November 2023 and in October 2025 the applicant asked to extend review to 22 December 2026, and no cost has been published.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference, the source included, supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Broncos FAQ targets the 2031 NFL season. September 1 is an estimated season anchor, not an exact announced opening day; the preferred-site planning process is not construction commencement.[1]
Burnham Yard, a former rail yard less than a mile southeast of Empower Field at Mile High, is the Broncos' preferred site for a privately funded retractable-roof stadium anchoring a mixed-use district of parks, housing, shops and restaurants. The Walton-Penner ownership group is paying for the stadium itself, with Denver and Colorado covering surrounding public improvements.
Estimated: San Joaquin County, California; retained approximate Stockton-area context, not a verified Alta Casa parcel
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
October 21, 2031 is CAISO’s[1] proposed completion date, not a confirmed COD.
CAISO lists active queue 1922, Alta Casa Storage, with 515.418 MW battery component capacity and 500 MW maximum export in San Joaquin County. Its current proposed completion date is October 21, 2031, at PG&E’s Tesla 500 kV point of interconnection.
Estimated: East Baseline Road near the Elliott Station substation, Scott Township, Vanderburgh County, IN (approximate; Elliott locality, Evansville)RWE
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
14News[1] (29 Sep 2026): "The facility is expected to be up and running no later than November 2031". Construction must start by 31 Dec 2029.
RWE Clean Energy Development affiliate Elliot Battery Storage plans a roughly 200 MW, 200M USD battery next to the Elliott Station substation in Scott Township, Vanderburgh County, Indiana; commissioners approved the economic development, decommissioning and road-use agreements on 29 September 2026 and the plant must be running by November 2031.
SCHEDULEDDate confidence: SCHEDULEDGiven as scheduledHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all SCHEDULED pins82% CONFIDENCEOverall confidence: 82%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
NASA's[1][2][3] eclipse catalogue gives the instant of greatest eclipse as 21:06:12 UT on 2031-11-14 (21:07:30 TD, the two separated by delta-T), from Saros series 143. Eclipse circumstances are computed from orbital mechanics, so the date and time are exact centuries ahead.
The Moon's shadow touches down at 21:06:12 UT on 2031-11-14, and the hybrid phase lasts up to 1 minute 8 seconds along a path 38.3 km wide crossing the Pacific and Panama. A partial eclipse is visible from the Pacific, southern the United States, Central America and northwestern South America.
Estimated: Sherman County, Oregon, USA (approximate EIA reporting point)Cedar Island Solar LLC
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
EIA[1]-860M August 2026 planned-operation month December 2031; month placeholder, approvals pending.
EIA’s August 2026 planned-generator inventory lists Cedar Island Solar LLC, plant 66011/PV 1, at 800 MW in Sherman County, with December 2031 planned operation and regulatory approvals pending, not under construction. The old$950 M budget and 2029 date are unsupported.
Pierce Clean Solar Energy Center, US Highway 81 & State Highway 13 Corridor, Pierce, Pierce County, NE 68767
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
2031-12-01 is the interconnection record’s requested in-service date, not a verified opening or commercial-operation day.
GEN-2018-131 is a 221.4 MW photovoltaic generation interconnection request in Pierce, NE. The grid operator lists its queue status as IA FULLY EXECUTED/ON SCHEDULE. The requested in-service date is 2031-12-01; this is a planning date.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins50% CONFIDENCEOverall confidence: 50%How well the pin's source and references back up its dates.Weighted average of how firmly 5 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
2031-12 is the preliminary planned operation month in EIA's[3] September 2026 survey (approvals pending). Day 01 is a month-precision anchor, not an announced opening day.
EIA's September 2026 preliminary inventory lists 800 MW of photovoltaic nameplate capacity at Cedar Island Solar LLC in Sherman County, Oregon (reference point 45.2337, -120.8985 reported to EIA). Reported planned operation month: December 2031, with regulatory approvals pending. Cleanview lists Enlight Renewable Energy's pipeline as including Cedar Island Solar LLC, 800 MW, Oregon.
Roma Clean Energy Storage Center, Vernon Boulevard & Astoria Waterfront Transmission Corridor, Long Island City, Queens County, NY 11106Roma Storage LLC
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
2031-12 is the requested commercial-operation month in NYISO[1][3]. Day 01 is only a month-precision anchor, not an announced commissioning day.
C26-0002 is a 300 MW battery storage interconnection request in Queens, NY. The grid operator lists its queue status as Active interconnection request. The requested in-service date is 2031-12-01; this is a planning date.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins51% CONFIDENCEOverall confidence: 51%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Estimated: December 2031 is an inherited planning marker, not a verified Eolus[1] opening commitment. The current developer page gives no completion schedule; the 2023 special-use request was withdrawn. A fresh primary interconnection record is needed to reconcile the precise date and the overlapping Hoodini queue pin.
Eolus lists Hoodini in planning with 450 MW of solar and a separate 450 MW storage component in Dateland, Arizona. A current budget and committed opening date are unpublished.
Renforth Drive at Eglinton Avenue West, Etobicoke, Toronto, Ontario, CanadaMetrolinx
DELAYEDDate confidence: DELAYEDThe date has movedHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all DELAYED pins8 years late55% CONFIDENCEOverall confidence: 55%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
The article says only that "The extension is expected to open in 2031", a year rather than a fixed day, so the pin sits on the last day of that year.[1]
The 9.2-kilometre westward extension of Line 5 Eglinton adds seven stations - four underground, two elevated and one in an open trench - ending at a trenched terminal at Renforth beside the eastern end of the Mississauga Transitway. Construction was estimated in 2026 at CA$3.97 billion, up from CA$2.47 billion a decade earlier.
Estimated: Approximate location in the reported project area; exact parcel pending
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
December 31, 2031 is the current queue’s requested date, not a guaranteed commissioning date; the prior December 2028 estimate is replaced.
CAISO’s current public queue lists active HOODINI request 1663 in Yuma County with 459.54 MW photovoltaic and 450 MW storage, limited to 450 MW net export, at SDG&E’s Hoodoo Wash 500 kV switchyard. Current requested date is December 31, 2031.
DOE Paducah Site, McCracken County, Kentucky, United StatesBrookfield
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
DCD, 29 July 2026: "at full build-out, the campus could support up to 1.8GW of utility capacity and more than 1.2GW of compute capacity by 2032"; POWER and DOE-based reports say construction is expected to finish in 2031. No month is given.[1]
Brookfield will lease land at the DOE Paducah Site in McCracken County, Kentucky for a campus of up to 1,800 MW of utility capacity (more than 1,200 MW of compute) with NextEra building up to 4.6 GW of dedicated generation and storage; the coalition cites 100B USD of private investment and full build-out in 2032.
Estimated: Google Lincoln Campus Building 7, North 56th Street & Interstate 80 Corridor, Lincoln, Lancaster County, NE 68528Google
UNVERIFIEDDate confidence: UNVERIFIEDNo wording about the date was foundHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all UNVERIFIED pins40% CONFIDENCEOverall confidence: 40%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 49% confidence or below
Separate construction cost, IT power, floor area and an opening date for this building or phase have not been verified. Published campus figures do not establish independent component figures.
Point of greatest eclipse at sea, off the South Atlantic
SCHEDULEDDate confidence: SCHEDULEDGiven as scheduledHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all SCHEDULED pins82% CONFIDENCEOverall confidence: 82%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
NASA's[1][2][3] eclipse catalogue gives the instant of greatest eclipse as 13:25:23 UT on 2032-05-09 (13:26:42 TD, the two separated by delta-T), from Saros series 148. Eclipse circumstances are computed from orbital mechanics, so the date and time are exact centuries ahead.
The Moon's shadow touches down at 13:25:23 UT on 2032-05-09, and the annular phase lasts up to 0 minutes 22 seconds along a path 43.7 km wide crossing the South Atlantic. A partial eclipse is visible from southern South America and southern Africa.
Estimated: Google Project Springboard Campus Building 3, John T. Griffin Industrial Park, Muskogee, Muskogee County, OK 74403Google LLC (Alphabet Inc.)
UNVERIFIEDDate confidence: UNVERIFIEDNo wording about the date was foundHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all UNVERIFIED pins40% CONFIDENCEOverall confidence: 40%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 49% confidence or below
Separate construction cost, IT power, floor area and an opening date for this building or phase have not been verified. Published campus figures do not establish independent component figures.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Given as a target, not a fixed date, per the pin description: "…s after Melbourne 1956 and Sydney 2000. Estimated date.…"
Australia's third Olympics after Melbourne 1956 and Sydney 2000. Estimated date.
SCHEDULEDDate confidence: SCHEDULEDGiven as scheduledHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all SCHEDULED pins80% CONFIDENCEOverall confidence: 80%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Wikipedia's[1][2][3] article dates it "from 24 August to 5 September 2032".
The 2032 Summer Paralympics, also known as the Brisbane 2032 Summer Paralympic Games, and branded as Brisbane 2032, will be the 19th edition of the Summer Paralympic Games, an international multi-sport parasports event governed by the International Paralympic Committee. The Games are scheduled to be held in Brisbane, Queensland, Australia, from 24 August to 5 September 2032. The article's infobox gives the stadium as Brisbane Olympic Stadium, the new 63,000-seat ground at Victoria Park, where this pin sits; Lang Park is assigned only rugby sevens and the football final at the 2032 Olympics.
Estimated: Google Lincoln Campus Building 8, North 56th Street & Interstate 80 Corridor, Lincoln, Lancaster County, NE 68528Google
UNVERIFIEDDate confidence: UNVERIFIEDNo wording about the date was foundHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all UNVERIFIED pins40% CONFIDENCEOverall confidence: 40%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 49% confidence or below
Separate construction cost, IT power, floor area and an opening date for this building or phase have not been verified. Published campus figures do not establish independent component figures.
Mercey Springs Road, Los Banos, Merced County, CA 93635Wingtip Solar LLC
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Current online date in CAISO[1] active queue 1943, row 194; estimate, not confirmed operation.
CAISO queue 1943 lists Wingtip Solar 1 as active in Merced County, with 1,176.1 MW each of solar and battery capacity and 1,150 MW net grid export. Its current online target is September 18, 2032, replacing the unsupported 2029 opening.
SCHEDULEDDate confidence: SCHEDULEDGiven as scheduledHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all SCHEDULED pins76% CONFIDENCEOverall confidence: 76%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Given as scheduled, per en.wikipedia.org[1]: "…should begin by 2024, with the project scheduled for completion in 2032.[47] On 31 March, the Itali…"
A proposed 3.3 km single-span suspension bridge linking Sicily to the Italian mainland, which would be by far the longest span ever built. Estimated date.
Charles River Bridge, Leverett Circle Connector, East Cambridge, Cambridge, Middlesex County, Massachusetts, 02222, United StatesMassachusetts Bay Transportation Authority
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 5 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Season only, per the MBTA[1][5] project page: "Anticipated project completion: Fall 2032" - taken as the last day of fall 2032.
The $1.3 billion replacement of North Station's Draw One drawbridge is due to finish in fall 2032, adding two tracks over the Charles River and two station tracks for the northside Commuter Rail and the Amtrak Downeaster.
Centralny Port Komunikacyjny, Baranow, Grodzisk County, Masovian Voivodeship, PolandCentralny Port Komunikacyjny
SCHEDULEDDate confidence: SCHEDULEDGiven as scheduledHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all SCHEDULED pins76% CONFIDENCEOverall confidence: 76%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Given as scheduled, per the source[1]: "Port Polska's new airport is set to open in 2032".
Poland's planned Centralny Port Komunikacyjny (CPK) airport and high-speed rail hub, 25 miles west of Warsaw, is now targeted to open in 2032.
Estimated: Industrial Park North, near U.S. 31 and County Road 400 North, Kokomo, Howard County, Indiana (coordinates approximate: nearest OpenStreetMap-geocoded county road north of Kokomo)Digital Realty
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 5 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
WISH-TV[1] (2 Oct 2026): Mayor Tyler Moore "said the project is expected to take several years to build, with a completion date in 2033"; WRTV[4] (14 Oct 2026): "four to six years to complete".
Digital Realty proposed a three-building, 3-million-square-foot data center campus (about 920 MW per Cleanview, about 1,500 MW at full build per the company) on 476 acres at Industrial Park North in Kokomo, Indiana, powered by Duke Energy and targeted for 2033; total cost is reported as 1-3 billion USD, so no single figure is posted.