ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins53% CONFIDENCEOverall confidence: 53%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Targeting commercial operation in October 2028 pursuant to Georgia[1] Public Service Commission Integrated Resource Plan approvals and utility interconnection queue schedules.
The Camellia Clean Energy Center is a 150 MWac utility-scale solar photovoltaic generation facility located across managed timberlands in Effingham County, Georgia. Connecting into Georgia Power’s high-voltage transmission network, the facility supplies clean, emissions-free wholesale electricity to power rapid industrial manufacturing and advanced technology growth along the Savannah coastal corridor.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
October 2028 is the proposed commercial operation date in ERCOT queue data as reproduced by Cleanview[1] and Infrasure[3] aggregators; no developer-confirmed date.
Rain Lily Solar 1 is a planned solar farm of about 148 MW in Hood County, Texas, tracked in the ERCOT queue as 27INR0288. It is expected to come online in October 2028 and is paired with a separate Rain Lily Storage 1 battery project at the same point of interconnection.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins60% CONFIDENCEOverall confidence: 60%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Proposed completion from EIA-860M data (via interconnection.fyi[2]); no developer date published.
Bedington Energy Facility, LLC proposes a 100 MW solar plant on a former DuPont brownfield site near Bedington in Berkeley County, approved by the West Virginia PSC in 2024. EIA data lists a proposed completion of October 2028.
UNVERIFIEDDate confidence: UNVERIFIEDNo wording about the date was foundHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all UNVERIFIED pins40% CONFIDENCEOverall confidence: 40%How well the pin's source and references back up its dates.Weighted average of how firmly 5 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 49% confidence or below
Project Gold’s revised August 2026 application proposes six single-story data centers across Clifton and Covington townships. The developer estimates USD 18 billion on 998.8 acres and requests 2.2 GW of grid service. Covington has acknowledged the application; hearing preparations remain documented in later township records. Approval, physical construction and a delivery date remain unverified.
County Road 34 & County Road P, Tekamah, Burt County, NE 68061Invenergy
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference, the source included, supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
February 2025 developer factsheet targets Q4 2028; October 1 is quarter-only precision, not a scheduled day. Current phase schedule needs confirmation.[1]
Invenergy’s February 2025 factsheet identifies Beeline in Burt County as a proposed 250 MW solar project targeting Q4 2028 operation. This replaces the prior single 500 MW / $700M tracker presentation; larger county permit scope needs phase-specific reconciliation.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins60% CONFIDENCEOverall confidence: 60%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Proposed completion date from the PJM queue record (via interconnection.fyi[1] and InfraSure[2] aggregators).
Ridge Road Solar Farm is a 19.8 MW solar project in the PJM queue (AG1-495) in Hunterdon County, New Jersey, with an executed interconnection agreement. The queue lists a proposed completion of October 1, 2028.
Estimated: Muskie Data Campus, EastPark Industrial Park, Boyd/Greenup counties near Grayson, Kentucky; map position approximateTeraWulf
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Kentucky Power[1] October 2026 fact sheet targets first 100 MW in October 2028 and full 1,000 MW October 2029, conditional on approvals/construction. Day 1 is month precision.
Muskie is TeraWulf’s EastPark campus near Grayson, not a verified 250 MW Catlettsburg facility. Kentucky Power’s October fact sheet describes an amended 1 GW agreement awaiting PSC approval, ramping from 100 MW in October 2028 to full service in October 2029.
734 Naugatuck Avenue, Milford, New Haven County, CT 06460Jupiter Power
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Connecticut DEEP procurement award and ISO-NE interconnection queue milestones specify commercial operation in October 2028.[1]
Jupiter Power, backed by BlackRock's Global Infrastructure Partners, is developing the 200 MW utility-scale Naugatuck Avenue Battery Storage project in Milford, New Haven County, Connecticut. Formally selected by the Connecticut Department of Energy and Environmental Protection (DEEP) in its competitive zero-carbon procurement, the standalone four-hour BESS repurposes industrial land along the Naugatuck Avenue utility corridor to provide 800 MWh of flexible capacity, reduce winter peak dependence on natural gas, and enhance ISO New England grid reliability.
County Road 111 & US Highway 84, Snyder, Scurry County, TX 79549Zeus Scurry BESS
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
ERCOT[1] September 2026 row 1276, 27INR0535 projected COD; no IA, estimate.
ERCOT’s September 2026 GIS report lists Zeus Scurry BESS (27INR0535), Zeus Scurry BESS, at 1,043.07 MW with projected COD 2028-10-01. Screening is complete and FIS has started, with no interconnection agreement; the old capacity-scaled budget is removed.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Date is the EIA-860M proposed completion (October 2028) shown by interconnection.fyi[3][4]; the developer's original end-2023 target was missed and no firm date is published.
Rustic Hills Solar is a planned solar project in Warrick County, Indiana developed by Clenera, with Hoosier Energy signing a 20-year PPA in 2021. EIA-860M data list Rustic Hills Solar I (and a sister Rustic Hills Solar II) at 100 MW each with proposed completion in October 2028.
Estimated: US Highway 12 & Dodd Road, Wallula, Walla Walla County, WA 99363Amazon Web Services (AWS)
UNVERIFIEDDate confidence: UNVERIFIEDNo wording about the date was foundHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all UNVERIFIED pins40% CONFIDENCEOverall confidence: 40%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 49% confidence or below
Separate construction cost, IT power, floor area and an opening date for this building or phase have not been verified. Published campus figures do not establish independent component figures.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins53% CONFIDENCEOverall confidence: 53%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Commercial operation scheduled for October 2028 pursuant to South Dakota Public Utilities Commission (SDPUC) siting filings and WAPA interconnection queue schedules.[1]
The Wild Hare Solar Facility is a 100 MWac utility-scale solar photovoltaic generation facility located across open plains in Hughes County, South Dakota. Interconnecting into the Western Area Power Administration (WAPA) high-voltage transmission system near Pierre, the facility delivers cost-effective renewable electricity to municipal utilities, rural cooperatives, and wholesale customers across the Upper Great Plains.
SCHEDULEDDate confidence: SCHEDULEDGiven as scheduledHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all SCHEDULED pins78% CONFIDENCEOverall confidence: 78%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Wikipedia's[1][3] article now dates it 12 October to 12 November 2028, and ARY News[2] (23 October 2026) reports the ICC finalised those dates in an updated calendar; the pin's earlier 21 October to 19 November window is superseded.
The 2028 ICC Men's T20 World Cup will be the eleventh edition of the ICC Men's T20 World Cup, co-hosted by Cricket Australia and New Zealand Cricket from 12 October to 12 November 2028. It will be the first time that New Zealand would host the event, while Australia had previously hosted the competition in 2022. The article names no venues, so this pin sits at Melbourne Cricket Ground, the lead host's flagship ground.
US Highway 285 & Farm to Market Road 1450, Pecos, Pecos County, TX 79772Indigo solar 3
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
2028-11-01 is the interconnection record’s requested in-service date, not a verified opening or commercial-operation day.
28INR0067 is a 800 MW photovoltaic generation interconnection request in Fisher, TX. The grid operator lists its queue status as SS Completed, FIS Started, No IA. The requested in-service date is 2028-11-01; this is a planning date.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Leeward Renewable Energy project acquisition timeline and PJM interconnection queue establish commercial operation for late 2028.[1]
Leeward Renewable Energy is constructing the 350 MWac Harvey Solar Project across approximately 2,600 acres in Bennington and Hartford Townships, Licking County, Ohio. Fully certificated by the Ohio Power Siting Board under Case 21-0164-EL-BGN and affirmed by the Ohio Supreme Court, the utility-scale installation injects over $3 million annually into local schools and services while powering tens of thousands of Ohio homes.
Carriger Solar Facility, 2 miles northwest of Goldendale, Klickitat County, WA 98620Cypress Creek Renewables
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Washington EFSEC Site Certification Agreement and developer filings schedule commercial operation for November 2028.[1]
Cypress Creek Renewables received governor approval and an Energy Facility Site Evaluation Council (EFSEC) Site Certification Agreement for the Carriger Solar Project in Klickitat County, Washington. Sited on approximately 1,300 acres northwest of Goldendale, the project pairs 160 MWac of solar generation with a 63 MW battery energy storage system to supply zero-emission power under Washington Clean Energy Transformation Act.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference, the source included, supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
November 2028 is the EIA proposed date via Cleanview; Hawaiian Electric gives only a 2027-2033 window.[1]
The Hawaii PUC approved contracts in June 2026 for Kuihelani Solar Phase 2, a 40 MW solar project with 160 MWh of battery storage on Maui. EIA-based trackers list a proposed November 2028 completion.
State Highway 70 & County Road 114, Roby, Fisher County, TX 79543Indigo solar 3
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
ERCOT[1] September 2026 GIS row 1335, 28INR0067 projected COD; estimate, no IA.
ERCOT September 2026 GIS row 1335 lists Indigo Solar 3 (28INR0067), Indigo solar 3, with 800.00 MW solar and projected COD 2028-11-01. Screening is complete and FIS has started, with no IA. The prior capacity-scaled budget is cleared.
49 South Sheridan Drive area, Clarion Borough, Clarion County, PennsylvaniaMiles Brothers, LLC
UNVERIFIEDDate confidence: UNVERIFIEDNo wording about the date was foundHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all UNVERIFIED pins40% CONFIDENCEOverall confidence: 40%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 49% confidence or below
The Glassworks Data Campus is a conceptual data center plan on about 100 acres in Clarion Borough, backed by the Miles family of companies. Marketing materials cite immediate access to 100 MW of grid power and up to 700 MW with on-site generation. County officials said in January 2026 that no formal proposal had been filed and the concept depends on securing a tenant.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins60% CONFIDENCEOverall confidence: 60%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Proposed completion date from the SPP queue record as shown by interconnection.fyi[1] and Cleanview[2]; no developer-confirmed date.
Comanche Solar is a 500 MW solar project in the SPP interconnection queue (GEN-2020-087) in Comanche County, Oklahoma, with a proposed completion of November 30, 2028. A 2020 state land lease near Lawton was won by EDF Renewables for a 250 MW plan; no source reviewed ties that lease to this queue entry.
About 11 miles north of Prosser, Benton County, WashingtonBrightNight
UNVERIFIEDDate confidence: UNVERIFIEDNo wording about the date was foundHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all UNVERIFIED pins40% CONFIDENCEOverall confidence: 40%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 49% confidence or below
Hop Hill Solar is a proposed solar facility of up to 500 MW with battery storage of up to 500 MW about 11 miles north of Prosser in Benton County, Washington. EFSEC received the site certification application on December 22, 2022 and a November 15, 2023 order found it inconsistent with local land-use regulations; the application remains in review.
State Highway 199 & Texoma Lake Road Corridor, Kingston Area, Marshall County, OK 73439Peregrine Energy Solutions
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
OG&E interconnection agreement and SPP definitive interconnection study establish COD for late 2028.[1]
Peregrine Energy Solutions is constructing the 200 MW / 800 MWh utility-scale Texoma Energy Storage Project in Marshall County, Oklahoma, near the Texas border. Having executed an interconnection agreement with Oklahoma Gas & Electric (OG&E) within the Southwest Power Pool (SPP) market, the four-hour battery installation mitigates southern Oklahoma transmission bottlenecks and enhances regional grid resilience against extreme weather events.
Pine Street & US Highway 75 Corridor, Tulsa, Tulsa County, OK 74106Eolian Energy
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
The saved date is an estimated development target, not an actual opening. The primary source describes a proposal or future construction; no completion is inferred from the elapsed target.[1]
SPP’s exact GEN-2018-028 study identifies the 200MW Tulsa North AEP battery proposal in Tulsa County. The interconnection study and associated network-upgrade estimates do not establish physical construction or battery cost.
Gallagher-Twining Solar Facility, State Highway 55 Corridor, West Branch, Ogemaw County, MI 48661
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
2028-11-01 is the interconnection record’s requested in-service date, not a verified opening or commercial-operation day.
J3274 is a 290 MW photovoltaic generation interconnection request in Ogemaw, MI. The grid operator lists its queue status as Active. The requested in-service date is 2028-11-01; this is a planning date.
UNVERIFIEDDate confidence: UNVERIFIEDNo wording about the date was foundHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all UNVERIFIED pins40% CONFIDENCEOverall confidence: 40%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference, the source included, supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 49% confidence or below
Cielo Digital Infrastructure has proposed a data center campus in Clarksville, Montgomery County, Tennessee, listed by trackers at 350 MW on 107 acres. It remains a proposal; no timeline, permits or power agreement have been found.
The White House, 1600 Pennsylvania Avenue NW, Washington, DC
SCHEDULEDDate confidence: SCHEDULEDGiven as scheduledHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all SCHEDULED pins72% CONFIDENCEOverall confidence: 72%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Federal law sets Election Day on the Tuesday after the first Monday in November, which falls on November 7 in 2028.[1]
Kalshi
Polymarket
Election Day for the 2028 U.S. presidential race is November 7, 2028, and Kalshi's winner market was still wide open on 20 September 2026: J.D. Vance led at 22%, followed by Jon Ossoff at 12% and Marco Rubio at 9.6%. The winner takes office on January 20, 2029.