MetLife Stadium, 1, MetLife Stadium Drive, East Rutherford, Bergen County, New Jersey, 07073, United StatesFIFA
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins86% CONFIDENCEOverall confidence: 86%How well the pin's source and references back up its dates.Weighted average of how firmly 5 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Stated as firm, per fifa[5].com[1][3][4]: the final was "played at New York New Jersey Stadium on Sunday 19 July at 15:00 (local time)", which is 19:00 UTC in summer time.
Ferran Torres scored in the 106th minute as Spain beat defending champions Argentina 1-0 after extra time before 80,663 at MetLife Stadium, winning their second World Cup.
Aldi Nord Campus, Eckenbergstraße 16b, Kray, 45307 Essen, GermanyAldi Nord
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins88% CONFIDENCEOverall confidence: 88%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Aldi Nord's[1] press list dates the release "20.07.2026 – ALDI setzt auf den besten Preis für alle und verzichtet deshalb auf App-Rabatte".
Aldi Nord and Aldi Süd said they will not offer app-only coupons or loyalty prices, launching ad campaigns that pitch the same shelf price for every shopper against rivals' bonus apps.
US Court of Appeals 9 Circuit, 95, 7th Street, South of Market, Tenderloin, San Francisco, California, 94103, United StatesSable Offshore
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins85% CONFIDENCEOverall confidence: 85%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
The Attorney General's release, dated Monday, July 20, 2026: 'California Attorney General Rob Bonta today filed a second petition against the Trump Administration'; the petition itself is signed 'this 20th day of July, 2026'.[1]
Attorney General Rob Bonta and the State Fire Marshal petitioned the Ninth Circuit to overturn PHMSA's 25 June special permit, which lets Sable Offshore run the onshore CA-324 and CA-325 lines without the rule to repair longitudinal seam weld corrosion within 180 days.
Kellogg's, 9601 F Street, Millard, Omaha, Nebraska 68127, United StatesFerrero
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins85% CONFIDENCEOverall confidence: 85%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
WK Kellogg's[4] WARN letter of May 22, 2026 sets about 100 job losses in the period to August 3 from July 20 and about 350 'on or after August 4th through August 18th', with the plant to 'permanently cease operations in August 2026'.
Ferrero's WK Kellogg Co shut its 1942 cereal plant at 9601 F Street in Omaha, laying off 451 union and non-union workers in two waves from 20 July to 18 August 2026.
Estimated: Boron / Desert Lake, eastern Kern County, California; retained approximate project-area point, not a surveyed phase boundaryAvantus
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins95% CONFIDENCEOverall confidence: 95%How well the pin's source and references back up its dates.Weighted average of how firmly 5 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Confirmed July 20, 2026 announcement that Aratina 1 had achieved commercial operations; exact energization day is not independently established.[1]
Avantus announced commercial operations for Aratina 1 on July 20, 2026: 200 MW solar and 500 MWh storage. Its project website places the 350 MW two-phase program near Boron and Desert Lake in eastern Kern County, with Phase 1 operating and Phase 2 under construction.
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins86% CONFIDENCEOverall confidence: 86%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Nvidia[2] confirmed on July 21, 2026 that 'systems are now shipping to customers'.
Nvidia said its Vera Rubin NVL72 rack systems are now shipping to cloud providers and system makers, with 288 GB of HBM4 per GPU and about five times Blackwell's inference performance.
Googleplex, 1600 Amphitheatre Parkway, Mountain View, California 94043, United StatesGoogle
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins82% CONFIDENCEOverall confidence: 82%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
9to5Google's[2] launch report is dated 21 July 2026 and says Google "also announced Gemini 3.5 Flash-Lite"; DeepMind's[1] 3.5 Flash-Lite model card is published 21 July 2026.
Google releases Gemini 3.5 Flash-Lite for high-throughput, low-latency work at $0.30 per million input tokens and $2.50 per million output tokens, beating Gemini 3 Flash on SWE-Bench Pro and OSWorld-Verified.
Googleplex, 1600 Amphitheatre Parkway, Mountain View, California 94043, United StatesGoogle
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins84% CONFIDENCEOverall confidence: 84%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
9to5Google's[1] launch report is dated 21 July 2026 and says Google "today announced Gemini 3.6 Flash and 3.5 Flash-Lite"; DeepMind's[2] 3.6 Flash model card is published 21 July 2026.
Google releases Gemini 3.6 Flash, a cheaper and more token-efficient successor to 3.5 Flash that uses 17% fewer output tokens and lifts OSWorld-Verified computer use from 78.4% to 83%.
East Francis Avenue, Oakridge, Tampa Heights, Tampa, Hillsborough County, Florida, 33602, United StatesTesla
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins83% CONFIDENCEOverall confidence: 83%How well the pin's source and references back up its dates.Weighted average of how firmly 5 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Not a Tesla App[1], 21 July 2026: 'The official @robotaxi account announced the expansion on X, confirming that Robotaxi rides are now live in Orlando and Tampa'; that post is stamped 13:00 UTC (9 a.m. EDT) on 21 July.
Eighteen days after Miami, Tesla opened unsupervised Robotaxi rides in Orlando and Tampa, bringing the service to seven US metros, three of them in Florida.
General Motors Headquarters, Hudson's Detroit, Detroit, Michigan, United StatesGeneral Motors
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins83% CONFIDENCEOverall confidence: 83%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
The PR Newswire release is dated 'DETROIT, July 21, 2026'; Reuters (via BNN Bloomberg[4]) was published July 21, 2026 and says GM lifted its outlook 'on Tuesday'.
On 21 July 2026 GM reported second-quarter revenue of US$48.0 billion, EBIT-adjusted of US$3.9 billion and net income of US$1.3 billion, and raised its 2026 EBIT-adjusted guidance to US$14.0-16.0 billion.
Northrop Grumman Corporation Global Headquarters, 2980, Fairview Park Drive, Falls Church, Fairfax County, Virginia, 22042, United StatesNorthrop Grumman
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins78% CONFIDENCEOverall confidence: 78%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
The release is datelined 'FALLS CHURCH, Va. - July 21, 2026' and says 'Northrop Grumman will webcast its earnings conference call at 9:30 a.m. Eastern Time on July 21, 2026' (13:30 UTC).[1]
Northrop Grumman reported second-quarter 2026 sales of $10.9 billion, up 5%, and earnings of $7.68 a share, won $20 billion of net awards including $7.6 billion for Sentinel to reach a record $104.7 billion backlog, and raised its 2026 sales and EPS guidance.
San José Iturbide, Guanajuato 37984, MexicoFerrero
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins82% CONFIDENCEOverall confidence: 82%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
The Guanajuato government bulletin is datelined 'San José Iturbide, Gto. 21 de julio de 2026' and reports the governor leading 'la ceremonia del anuncio' of the $86 million investment.[1]
Ferrero announced an $86 million expansion of its San José Iturbide plant in Guanajuato, strengthening Nutella and chocolate production, storage and a new high-voltage power supply to lift exports to North America.
Ehemaliges Hauptgebäude OMEGA, 6, Faubourg du Lac / Seevorstadt, Neustadt / Nouvelle ville, Biel/Bienne, Verwaltungskreis Biel/Bienne, Verwaltungsregion Seeland, Bern/Berne, 2502, Schweiz/Suisse/Svizzera/SvizraSwatch Group
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins83% CONFIDENCEOverall confidence: 83%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Swatch Group's[1] own half-year report page is timestamped 'July 21, 2026 at 17:35:13 (CEST)', which is 15:35 UTC.
Swatch Group posted CHF 3,121 million in first-half 2026 net sales, up from CHF 3,059 million a year earlier and 8.5% higher at constant exchange rates, even as a stronger Swiss franc cut nearly CHF 200 million from the reported total.
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins85% CONFIDENCEOverall confidence: 85%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Happened as dated, per the source[1]: "co-owners of the tower voted to scrap the ambitious transformation" at a 21 July 2026 general assembly.
Ten years after Paris approved Nouvelle AOM's full glass-facade transformation of the Tour Montparnasse, the tower's co-owners voted to abandon that plan in favour of a smaller, cheaper intervention.
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins90% CONFIDENCEOverall confidence: 90%How well the pin's source and references back up its dates.Weighted average of how firmly 7 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Ceremony was July 20, 2026 (WBEN) while the Pennrose[1][2]/state release is dated July 21; pin date is the announcement day. Cost reports vary: $189M (WKBW[6]), about $200M (WBEN), $225M (state, latest).
Construction is underway on 251 homes at Canalside, including 187 affordable apartments up to 80% AMI; other apartments are market rate. Construction-start announcement published July 21, 2026.
1600 Amphitheatre Parkway, Mountain View, California, United StatesAlphabet
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins85% CONFIDENCEOverall confidence: 85%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
The earnings release is datelined 'MOUNTAIN VIEW, Calif. - July 22, 2026' and covers the quarter ended June 30, 2026.[1]
On 22 July 2026 Alphabet reported second-quarter revenue of US$119.8 billion, up 24%, with Google Cloud revenue up 82% to US$24.8 billion and operating margin of 34%.
Lee Street, Haymarket, Sydney, New South Wales, AustraliaAtlassian
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins90% CONFIDENCEOverall confidence: 90%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference, the source included, supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
The report says a "topping out ceremony" was held at the Atlassian Central skyscraper in Sydney on Wednesday, 22 July 2026.[1]
The 39-storey, 180-metre tower beside Central Station reached its full height at a topping-out ceremony, making it the world's tallest hybrid timber and steel building. Co-owned by Atlassian and the property group Dexus, it anchors Sydney's Tech Central precinct and is expected to be completed in 2027.
Mark O. Hatfield United States Courthouse, 1000, Southwest 3rd Avenue, Downtown, Portland, Multnomah County, Oregon, 97204, United StatesNike
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins83% CONFIDENCEOverall confidence: 83%How well the pin's source and references back up its dates.Weighted average of how firmly 5 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
The verdict form in Hender v. Nike, Inc., 3:18-cv-01477-AB, is stamped "Filed 07/22/26" and dated by the presiding juror the 22nd day of July, 2026.[1]
A Portland federal jury found on 22 July 2026 that Nike paid former process engineer Heather Hender less than male colleagues and promoted her more slowly because of her sex, awarding $19,739.52 plus $7.5 million in punitive damages under each of federal and Oregon law.
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins92% CONFIDENCEOverall confidence: 92%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference, the source included, supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better46 episodes
Broadcast start date confirmed on the title's own MyAnimeList[1] listing.
Yi Nian Yongheng 4 begins streaming, B.CMAY PICTURES' fourth and final season of its A Will Eternal (Yi Nian Yong Heng) donghua adaptation, continuing Bai Xiaochun's long climb through the cultivation world.
Drève Olympique - Olympische dreef 15, Anderlecht, 1070, BelgiumAldi Nord
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins82% CONFIDENCEOverall confidence: 82%How well the pin's source and references back up its dates.Weighted average of how firmly 5 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Aldi Belgium's release dated 22/07/2026: 'vandaag opent de eerste ALDI-winkel op één van de voormalige Shopping Cora[2]-sites'.
Aldi Belgium opened a 1,200 m2 store at the former Shopping Cora centre on Drève Olympique in Anderlecht, the first of three Aldi stores in ex-Cora malls and a rare move by the discounter into Belgian shopping centres.
United States Capitol, First Street Southeast, Navy Yard, Ward 8, Washington, District of Columbia, 20004, United StatesSable Offshore
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins83% CONFIDENCEOverall confidence: 83%How well the pin's source and references back up its dates.Weighted average of how firmly 5 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
The Independent[1]: 'The Hunt amendment ... won by just one vote 215 to 214 in a separate vote on Tuesday night' (21 July); timed to the House[5] Clerk's roll call 260, 'Jul 21, 2026, 09:25 PM', Hunt of Texas Part A Amendment No. 7, 'Agreed to', 215-214.
By 215 votes to 214, the House added Rep. Wesley Hunt's amendment to the 2027 defense bill, authorizing the Defense Secretary to acquire easements, including by condemnation, along Sable Offshore's Santa Ynez Pipeline System through state land and Gaviota State Park.
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins78% CONFIDENCEOverall confidence: 78%How well the pin's source and references back up its dates.Weighted average of how firmly 5 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
CnEVPost[1][3][4][5], dated 22 July 2026, says He Xiaopeng "confirmed the inclusion in a Weibo post on Wednesday" of Aridge in the CAAC's proposed list.
China's aviation regulator CAAC published a proposed first batch of compliant companies for passenger eVTOL airworthiness certification that includes XPeng's flying-car unit Aridge, which He Xiaopeng confirmed on 22 July 2026.
United States Capitol, First Street Southeast, Navy Yard, Ward 8, Washington, District of Columbia, 20004, United StatesUnited States House of Representatives
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins82% CONFIDENCEOverall confidence: 82%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
The House of Representatives passed H.R. 8800, the National Defense Authorization Act for Fiscal Year 2027, by 216 votes to 212, with seven Republicans voting against and six Democrats in favour amid the Iran war.
TOU Towers, 6, Yitzhak Sadeh, Tel Aviv, Montefiore, Tel-Aviv, Tel Aviv Subdistrict, Tel-Aviv District, 6713701, IsraelMonday.com
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins84% CONFIDENCEOverall confidence: 84%How well the pin's source and references back up its dates.Weighted average of how firmly 5 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
monday.com's Form 6-K says "On July 22, 2026, monday.com Ltd. (the "Company") initiated a restructuring plan" that "includes a reduction of approximately 20% of the Company's current workforce"; Ctech's report of the staff letter is dated 22.07.26.[1]
Monday.com is cutting about 20% of its global workforce, around 620 jobs with some 350 at its Tel Aviv headquarters, as it reorganises around its AI Work Platform.
San Diego Convention Center, 111, West Harbor Drive, Downtown San Diego, San Diego, San Diego County, California, 92101, United StatesSan Diego Comic Convention
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins83% CONFIDENCEOverall confidence: 83%How well the pin's source and references back up its dates.Weighted average of how firmly 6 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Confirmed: Comic-Con's[1][2][6] own site gives "Comic-Con 2026, July 23–26 at the San Diego Convention Center" with "Preview Night on Wednesday, July 22, 2026", and Times of San Diego[3][4][5] reports the mayor spoke "on the opening day of this year's event... Wednesday morning" (22 July), so the pin runs from Preview Night on Wednesday 22 July to the exclusive 27 July.
San Diego Comic-Con filled the San Diego Convention Center from its Wednesday 22 July Preview Night through 26 July 2026, expecting 135,000 attendees as the city secured the convention through 2030.
James Forrestal Energy Department Building, 1000, Independence Avenue Southwest, Ward 6, Washington, District of Columbia, 20585, United StatesUnited States Department of Energy
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins81% CONFIDENCEOverall confidence: 81%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
The Department of Energy's[1] announcement is dated 22 July 2026 and gives a 10 September 2026 deadline; a state SBIR office confirms the 2 p.m. Eastern pitch deadline.
The Department of Energy announced on 22 July 2026 about 40 Phase I awards from a $10 million pool on four AI-for-science topics, with a pitch-first process and a deadline of 2 p.m. Eastern on 10 September.
Old Billingsgate Market, 10, Lower Thames Street, Leadenhall Market, Monument, City of London, Greater London, England, EC3R 8BU, United KingdomSamsung Electronics
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins88% CONFIDENCEOverall confidence: 88%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Samsung's[1] newsroom recap says 'On July 22, Samsung Electronics hosted Galaxy Unpacked July 2026 at Old Billingsgate in London' and that it 'introduced Galaxy Watch Ultra2 and Galaxy Watch9'.
Samsung introduced the Galaxy Watch9 from US$379 and the Galaxy Watch Ultra2 at Galaxy Unpacked on 22 July 2026, the first Galaxy Watches on Qualcomm's Snapdragon Wear Elite platform.