EUR 13.532 billion publicly funded bridge project.
“EUR 13.532 billion”
3,300-metre single bridge span with two 399-metre towers.
“3,300 metres”
Final project approved by CIPESS August 6, 2025; approval is not proof of physical construction.
“6 August 2025”
Three road lanes each direction including emergency lane, plus two railway tracks.
“two rail tracks”
Final project approved
“6 August 2025”
독자들의 사진으로, 출처가 있는 핀의 미디어와 별도로 표시됩니다. 먹거나 본 것을 평가하고, 레스토랑 핀에서는 사진에 바로 요리를 태그해 보세요.
첫 번째 항목은 항상 핀의 출처입니다. 전체 신뢰도는 각 자료가 위의 시작·종료 시각을 얼마나 확실히 뒷받침하는지에 대한 가중 평균이며, 자료는 최신 자료보다 180일 오래될 때마다 가중치가 절반이 됩니다.
출처에 따르면 날짜대로 진행되었습니다: "시칠리아와 칼라브리아 간의 영구적인 연결을 위한 최종 프로젝트를 승인했습니다".
Construction research 2026-10-24: The August 6, 2025 Messina pin represents final-design approval, so Proposed describes that historical pre-construction milestone. The CIPESS record states EUR13.532 billion for the complete bridge and associated road/rail connections, distinct from the Eurolink contract alone. Initial works were conditional on the approval becoming effective. The company’s 2025 accounts later record refusal of Court of Auditors registration; the approval is not represented as proof that physical bridge work began. Source quote: “ricusato il visto di registrazione della Delibera CIPESS n. 41 del 6 agosto 2025” Accounts approved April 29, 2026; PDF section 10 records October 29, 2025 refusal. Historical approval status does not assert current approval effectiveness.[1]
Webuild, the lead contractor, confirms CIPESS "approved the Definitive Design" on 6 August 2025 and that its Eurolink joint venture signed a €10.6 billion addendum with Stretto di Messina[2][6] the same day, independently corroborating the pin's date from the builder's side.
The Italian government's own CIPESS meeting page states the committee "approved the final project for a permanent connection between Sicily and Calabria" on 6 August 2025, an official primary source matching the pin's stored date exactly.[1]
Construction research 2026-10-24: The August 6, 2025 Messina pin represents final-design approval, so Proposed describes that historical pre-construction milestone. The CIPESS record states EUR13.532 billion for the complete bridge and associated road/rail connections, distinct from the Eurolink contract alone. Initial works were conditional on the approval becoming effective. The company’s 2025 accounts later record refusal of Court of Auditors registration; the approval is not represented as proof that physical bridge work began. Source quote: “Il costo dell’opera è di 13,532 miliardi di euro” PDF page 0: approval and exact whole-link cost, including approximately 40km of road/rail connections.[1]
빠지거나 잘못된 점이 있나요? 이 핀을 뒷받침하는 링크, 다른 시작일이나 종료일과 그 이유, 빠지거나 잘못된 사실을 자신의 말로 알려주세요. AI가 이 핀의 출처와 대조하고 더 나은 자료를 찾아, 뒷받침하는 페이지를 추가합니다. 핀 자체의 출처가 여전히 가장 중요하게 반영됩니다. AI는 이미지도 확인합니다. 다른 것을 보여주거나 제대로 보여주지 못하는 이미지는 뒤로 옮기거나 교체합니다.
원본 제목: Messina Strait Bridge Wins Final Design Approval
2025년 8월 6일 메시나 핀은 최종 설계 승인을 나타내므로 제안은 역사적 건설 전 이정표를 설명합니다. CIPESS 기록에는 Eurolink 계약과는 별개로 전체 교량 및 관련 도로/철도 연결에 대해 EUR135억 3200만이 명시되어 있습니다. 초기 작업은 승인이 발효되는 것을 조건으로 했습니다. 회사의 2025년 계정에는 나중에 감사원 등록 거부가 기록되어 있습니다. 승인은 물리적 교량 작업이 시작되었다는 증거로 표시되지 않습니다.