West Potomac Park, Ohio Drive SW, Washington, D.C. 20024, United States
District of Columbia Water and Sewer Authority
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins90% CONFIDENCEOverall confidence: 90%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference, the source included, supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better204 days ago
DC Water's[1] own release of April 10, 2026 announces the launch as having happened that day.DC Water lowered the tunnel boring machine Mary into a 100-foot-deep shaft in West Potomac Park and started her north towards Georgetown University, the first 2.4 miles of a 5.5-mile combined sewer overflow tunnel. The $819 million tunnel is part of the Clean Rivers Project and will cut Potomac overflow events from 74 a year to four; a second Herrenknecht machine, Emily, bores south towards Joint Base Anacostia-Bolling.