The first entry is always the pin's source. Overall confidence is a weighted average of how firmly each reference supports the start and end times used above; a reference counts half as much for every 180 days older than the newest.
Something missing or wrong? Say it in your own words: a link that backs this pin up, a different start or end date and why, or a fact it lacks or gets wrong. The AI checks it against this pin's sources, searches for better ones, and adds any page that backs you up. The pin's own sources still count most. A picture that shows something else, or shows it badly, is looked at too, and moved down or replaced.
Power storage360 MW · Proposed/studied scope, not measured output or evidence of operation. MISO lists J3994 as a 360 MW battery request at 18 MOROCCO 256583 in Monroe County, Michigan, with an April 1, 2028 in-service target. The active DPP-2026 request does no · source