The first entry is always the pin's source. Overall confidence is a weighted average of how firmly each reference supports the start and end times used above; a reference counts half as much for every 180 days older than the newest.
Wikipedia[2] gives October 24, 2024 for Arrow Lake-S desktop; HX mobile parts are listed January 6, 2025.
Roadmap table giving this generation's codename, first release date and process node.[1]
Intel's release introducing the Core Ultra 200S family on 10 October 2024, with retail availability from 24 October 2024.
Something missing or wrong? Say it in your own words: a link that backs this pin up, a different start or end date and why, or a fact it lacks or gets wrong. The AI checks it against this pin's sources, searches for better ones, and adds any page that backs you up. The pin's own sources still count most. A picture that shows something else, or shows it badly, is looked at too, and moved down or replaced.
| Claim | Intel's test |
|---|---|
| Up to 58% lower CPU package power | 1x1 Zoom call with background blur on the NPU |
| Up to 165 W lower system power | Average system power playing Warhammer: Space Marines 2 |
| Up to 36 platform TOPS | No baseline or footnote stated |
Intel-measured 'up to' figures; the release gives no baseline for the 36 platform TOPS. · source