The first entry is always the pin's source. Overall confidence is a weighted average of how firmly each reference supports the start and end times used above; a reference counts half as much for every 180 days older than the newest.
Stated as firm, per aramco.com's release dated "DHAHRAN|NOVEMBER 19, 2025": Aramco "has announced 17 Memoranda of Understanding (MoUs) and agreements", announced "today" to coincide with "the US-Saudi Investment Forum 2025 in Washington, DC".
Tracker page for the terminal: 9.5 mtpa, proposed and pre-FID, operation year 2031, in Cameron Parish, Louisiana; source of the site's approximate coordinates.[1]
LNG Prime's lead (the rest is paywalled) reports the day after that Aramco[1] signed a preliminary deal with Kimmeridge's Commonwealth LNG, developer of the 9.5 mtpa project near Cameron, Louisiana, as part of the 17 US agreements.
Pre-signing report (citing Upstream) that Aramco[1] would buy up to 2 mtpa from Commonwealth LNG, with the plant's FID expected before year-end and FERC's extension to 31 December 2031; also covers Aramco's 20 mtpa LNG goal and its Rio Grande Train 4 offtake.
Something missing or wrong? Say it in your own words: a link that backs this pin up, a different start or end date and why, or a fact it lacks or gets wrong. The AI checks it against this pin's sources, searches for better ones, and adds any page that backs you up. The pin's own sources still count most.